| Operator: | McMoRan |
| Water Depth: | 24 m / 79 ft |
| Region: | N. America - US GOM |
| Country: | US |
| Last Updated: | Jan 18, 2013 (view update history) |
|
The Blackbeard West prospect is situated on the Ship Shoal Block 188 in a water depth of 79 feet (24 meters) in the Gulf of Mexico. McMoRan operates the block with a 69.4 percent; EXXI 29.4 percent; W.A. Tex Moncrief, Jr. 7.7 percent.
McMoRan commenced exploratory drilling on the Blackbeard West No. 2 well on Nov. 25, 2011. The well is drilling below 11,700 feet (3,566 meters) with a proposed total depth of 26,000 feet. McMoRan is targeting Miocene-aged sands.
The Blackbeard West prospect is situated on the Ship Shoal Block 188 in a water depth of 79 feet (24 meters) in the Gulf of Mexico. McMoRan operates the block with a 69.4 percent; EXXI 29.4 percent; W.A. Tex Moncrief, Jr. 7.7 percent.
McMoRan commenced exploratory drilling on the Blackbeard West No. 2 well on Nov. 25, 2011. The well is drilling below 11,700 feet (3,566 meters) with a proposed total depth of 26,000 feet. McMoRan is targeting Miocene-aged sands.
|
|
|
Completion Underway at Blackbeard West No. 2
Type: Development Activity
Jan. 2013 - A production liner has been set in McMoRan Exploration's Blackbeard West-2 ultra-deep exploration well in Ship Shoal block 188. Three potential hydrocarbon bearing sections have been identified between 20,800 feet and 24,000 feet. Initial completion efforts are likely to focus on roughly 50 net feet of laminated Middle Miocene sands near the 24,000-foot mark. Pressure and temperature data imply that conventional completion equipment and technologies could be used at this depth. The well was drilled by the Rowan Louisiana (350' ILC).
|
|
|
|
Rowan Louisiana Nearing TD at Blackbeard West No. 2
Type: Drilling Operations
Nov. 2012 - The Rowan Louisiana (350' ILC) continues turning to the right at the McMoRan-operated Blackbeard West-2 well in Ship Shoal Block 188. The rig is drilling at a depth of 25,200 feet on its way to a proposed final depth of 25,500 feet in an effort to investigate deeper Miocene targets. Logging has revealed several low-resistivity pay zones, one of which is 80 feet thick and will garner further evaluation.
|
|
|
|
McMoRan Begins Drilling in Blackbeard West
Type: Status Update
Jan. 2012 - McMoRan commenced exploratory drilling on the Blackbeard West No. 2 well on Nov. 25, 2011. The well is drilling below 11,700 feet (3,566 meters) with a proposed total depth of 26,000 feet. McMoRan is targeting Miocene-aged sands.
|
|
|
Blackbeard West
|
|
Exploratory Drilling - Nov 25, 2011 to -
|
|
|
|
The SubseaIQ Team works everyday to provide you with the latest information on the offshore field development market.
The following table provides you with a detailed record of each addition and update made to this project by the SubseaIQ team.
|
| UPDATE TYPE |
DATE |
DAYS AGO |
| Field Updated |
Jan 18, 2013 |
151 |
|
| Activity Added |
Jan 18, 2013 |
151 |
|
| Field Updated |
Nov 28, 2012 |
202 |
|
| Activity Added |
Nov 28, 2012 |
202 |
|
| Field Updated |
Aug 01, 2012 |
321 |
|
| Project Description Added |
Jan 25, 2012 |
510 |
|
| Field Updated |
Jan 18, 2012 |
517 |
|
| Activity Added |
Jan 18, 2012 |
517 |
|
| Field Added |
Jan 05, 2012 |
530 |
|
| Field Status Added |
Jan 05, 2012 |
530 |
|
| Field Updated |
Jan 05, 2012 |
530 |
|
Project Update History Search - View all the lastest updates made by the SubseaIQ team.
|
|
| Field Name |
Blackbeard West |
|
| Discovery Date |
|
|
| Block |
Ship Shoal Block 188 |
|
| Reserve Type |
Gas |
|
| Current Status |
Exploratory Drilling |
|
| Production Start |
|
|
| Water Depth |
24 m / 79 ft |
|
|