| Operator: | Cabinda Gulf |
| Water Depth: | 396 m / 1,307 ft |
| Region: | Africa - West |
| Country: | Angola |
| Last Updated: | Nov 1, 2012 (view update history) |
|
The BBLT project is located in Angola’s Block 14, which consist of the Benguela-Belize-Lobito-Tomboco fields. The $2.2 billion crude oil and natural gas project is situated within the Lower Congo Basin, and spans 4,000 square kilometers in water depths ranging from 656 to 6,562 feet (200 to 2,000 meters). The project is the second major development in Block 14, which has yielded nine discoveries to-date.
Cabinda Gulf Oil Company Limited is the operator of the block, which is compromised of the following companies: Cabinda Gulf (31 percent), Agip Angola Exploration B.V. (20 percent), Sonangol Pesquisa & Producao, S.A.R.L. (20 percent), TotalFinaElf Exploration & Production, Angola (20 percent) and Galp-Exploracao e Producao Petrolifera, LDA (9 ...
The BBLT project is located in Angola’s Block 14, which consist of the Benguela-Belize-Lobito-Tomboco fields. The $2.2 billion crude oil and natural gas project is situated within the Lower Congo Basin, and spans 4,000 square kilometers in water depths ranging from 656 to 6,562 feet (200 to 2,000 meters). The project is the second major development in Block 14, which has yielded nine discoveries to-date.
Cabinda Gulf Oil Company Limited is the operator of the block, which is compromised of the following companies: Cabinda Gulf (31 percent), Agip Angola Exploration B.V. (20 percent), Sonangol Pesquisa & Producao, S.A.R.L. (20 percent), TotalFinaElf Exploration & Production, Angola (20 percent) and Galp-Exploracao e Producao Petrolifera, LDA (9 percent).
Field Development
The development was split in two phases, with the first phase consisting of the Benguela and Belize developments. The fields are connected to a compliant piled tower that supports an integrated drilling facility, and includes drilling and completion for more than 30 developments wells from the 40-slots.
Phase two – Lobito-Tomboco – incorporated the construction and installation of three subsea centers, each with a capability to handle nine subsea wells tied-back to the Benguela-Belize drilling and production platform and compliant tower.
First oil from the development commenced on June 7, 2006 and it produces roughly 245,000 barrels per day of crude oil.
Contracts
Daewoo was awarded an $820 million contract from Mustang, for engineering, procurement, construction and installation of the project's production facilities, CPT, and the oil and gas export pipelines.
The topside modules, built at Daewoo’s Okpo yard in South Korea, have an operating weight of 43,500 tons. Delta Engineering fabricated the 157-man accommodation module at its yard in Channelview, Texas. Sonamet constructed the drilling template, piles, flare boom, and helideck, which all weigh over 1,600 tons, at its yard in Lobito, Angola. Included in the topsides equipment are the facilities to handle 420,000 b/d of water re-injection.
For the subsea part of the project, Subsea 7 won the $270m contract for the 10km tieback of three subsea drill centers to the CPT. The work included fabrication and installation of the steel pipelines, flowline jumpers, connectors and umbilicals, as well as installation of the subsea manifolds. The steel flowlines were fabricated at the spoolbase in Luanda and the installation work was assigned to the pipelay vessel Skandi Navica. Vetco Gray carried out the three-year, $125 million contract for 22 horizontal subsea trees, six manifolds, and the fully integrated subsea and surface control systems. The 80 ton subsea manifolds (three production and three water injection) were built at Lobito, Angola, for Vetco.
|
|
|
GE Lands Lianzi Contract
Type: Contract Award
Nov. 2012 - GE Oil & Gas was awarded a $165 million contract to supply subsea production equipment to Chevron's offshore Lianzi project located between Angola and the Republic of Congo. The contract covers the supply of seven trees, nine subsea control modules, topside and subsea controls distribution equipment and vertical connection systems. The first tree is scheduled to be completed in 4Q 2013. Lianzi lies at a depth of 2,950 feet and will be developed with a subsea production system tied to the BBLT platform via a 27-mile heated flowline.
|
|
|
|
Subsea 7 to Supply, Install Subsea Components for Lianzi Development
Type: Contract Award
Aug. 2012 - Subsea 7 has won a contract to supply and install subsea components for the development of the Lianzi field offshore Congo and Angola. The contract's technical specifications include a 12-inch wet, insulated production flowline with direct electrical heating that will set a record for the deepest electrically-heated pipe. A part of the contract will be designed and fabricated in Luanda, with additional work carried out roughly 200 miles (322 kilometers) away in Lobito by Subsea 7's Angolan joint venture. All flowlines will be spooled to the Seven Oceans rigid reel-lay ship at Subsea 7's Luanda base. The $2 billion development will include a subsea production system and a 27-mile (43-kilometer) electrically heated flowline to transport the oil from the field to the BBLT platform. First oil is expected in 2015.
|
|
|
|
Chevron Tags $2B for Development of Offshore Lianzi Project
Type: Development Activity
Jul. 2012 - Chevron announced that its subsidiary will proceed with the development of the Lianzi field located in a unitized offshore zone between the Republic of Congo and the Republic of Angola. Located 65 miles (105 kilometers) offshore in approximately 3,000 feet (900 meters) of water, the Lianzi field will be developed via a subsea tie-back to the existing Benguela Belize Lobito Tomboco (BBLT) platform located in Angola Block 14. The $2 billion development will include a subsea production system and a 27-mile (43-kilometer) electrically heated flowline to transport the oil from the field to the BBLT platform. First oil is expected in 2015. Once completed, the project is expected to produce a maximum of 46,000 barrels of oil equivalent per day. Chevron Overseas Congo Limited is operator of the Lianzi field and has a 31.25% interest, along with Total (36.75%), ENI (10%), Sonangol (10%), SNPC (the Republic of Congo National Oil Company 7.5%), and GALP (4.5%).
|
|
|
Benguela-Belize Lobito-Tomboco Compliant Tower
|
|
Producing - Jul 07, 2006 to -
First oil from the Lobito-Tomboco subsea project was achieved on June 7, 2006.
|
|
|
Belize
|
|
Producing - Jun 07, 2006 to -
|
|
|
Benguela
|
|
Producing - Jun 07, 2006 to -
|
|
|
Lobito
|
|
Producing - Jun 07, 2006 to -
|
|
|
Tomboco
|
|
Producing - Jun 2006 to -
|
|
|
Belize
|
|
Under Development - Jul 01, 2005 to Jun 06, 2006
|
|
|
Benguela
|
|
Under Development - Jul 01, 2005 to Jun 06, 2006
|
|
|
Lobito
|
|
Under Development - Jul 2005 to 2006
|
|
|
Tomboco
|
|
Under Development - Jul 2005 to Jun 2006
|
|
|
|
The SubseaIQ Team works everyday to provide you with the latest information on the offshore field development market.
The following table provides you with a detailed record of each addition and update made to this project by the SubseaIQ team.
|
| UPDATE TYPE |
DATE |
DAYS AGO |
| Facility Updated |
Nov 01, 2012 |
205 |
|
| Activity Added |
Nov 01, 2012 |
205 |
|
| Facility Updated |
Aug 16, 2012 |
282 |
|
| Activity Added |
Aug 16, 2012 |
282 |
|
| Project Description Added |
Jul 31, 2012 |
298 |
|
| Field Updated |
Jul 31, 2012 |
298 |
|
| Field Added |
Jul 31, 2012 |
298 |
|
| Field Status Added |
Jul 31, 2012 |
298 |
|
| Facility Updated |
Jul 31, 2012 |
298 |
|
| Activity Added |
Jul 30, 2012 |
299 |
|
| Field Status Added |
Sep 07, 2011 |
626 |
|
| Field Status Updated |
Sep 07, 2011 |
626 |
|
| Facility Added |
Sep 07, 2011 |
626 |
|
| Facility Status Added |
Sep 07, 2011 |
626 |
|
| Facility Updated |
Sep 07, 2011 |
626 |
|
| Field Updated |
Sep 07, 2011 |
626 |
|
| Field Added |
Jul 06, 2009 |
1419 |
|
| Field Status Added |
Jul 06, 2009 |
1419 |
|
| Field Updated |
Jul 06, 2009 |
1419 |
|
Project Update History Search - View all the lastest updates made by the SubseaIQ team.
|
|
| Facility Name |
Benguela-Belize Lobito-Tomboco Compliant Tower |
|
| Duty |
Oil |
|
| Operator |
Cabinda Gulf |
|
| Current Status |
Producing since 2006 |
|
| Host Type |
Compliant Tower |
|
| Water Depth |
396 m / 1,307 ft |
|
| Dev.Cost |
n/a |
| |
| Region |
Angola |
| |
| Location |
Block 14 |
| Field Name |
Lobito |
|
| Discovery Date |
|
|
| Block |
Block 14 |
|
| Reserve Type |
Oil |
|
| Current Status |
Producing |
|
| Production Start |
Jun 2006 |
|
| Water Depth |
600 m / 1,980 ft |
| Field Name |
Belize |
|
| Discovery Date |
|
|
| Block |
Block 14 |
|
| Reserve Type |
Oil |
|
| Current Status |
Producing |
|
| Production Start |
Jun 2006 |
|
| Water Depth |
600 m / 1,980 ft |
| Field Name |
Tomboco |
|
| Discovery Date |
|
|
| Block |
Block 14 |
|
| Reserve Type |
Oil |
|
| Current Status |
Producing |
|
| Production Start |
Jun 2006 |
|
| Water Depth |
600 m / 1,980 ft |
| Field Name |
Benguela |
|
| Discovery Date |
|
|
| Block |
Block 14 |
|
| Reserve Type |
Oil |
|
| Current Status |
Producing |
|
| Production Start |
Jun 2006 |
|
| Water Depth |
600 m / 1,980 ft |
|