Offshore Field Development Projects
Foinaven Foinaven
Operator:BP
Water Depth:450 m / 1,485 ft
Region:Europe - North Sea
Country:UK
Last Updated:Jan 30, 2012    (view update history)
Project Description
The Foinaven field is located 118 miles (190 kilometers) west of the Shetland Islands in the UK on Blocks 204/19 and 204/24a. Situated in a water depth of 1,476 feet (450 meters), Foinaven was the first UK deepwater oil field to be developed in the Atlantic margin.

BP serves as the operator of the field and holds a 70% working interest; while Marathon holds the remaining interest.

Discovered in 1992, the Foinavan field is estimated to hold up to 1 billion barrels of oil. The field's reservoir is Paleocene in age and compromises channelized, siliciclastic turbidities with three main oil-containing sandstone intervals. In order to recover oil from the reservoir, hydrocarbon production volumes are replaced by injecting seawater into the reservoir via dedicated ...
The Foinaven field is located 118 miles (190 kilometers) west of the Shetland Islands in the UK on Blocks 204/19 and 204/24a. Situated in a water depth of 1,476 feet (450 meters), Foinaven was the first UK deepwater oil field to be developed in the Atlantic margin.

BP serves as the operator of the field and holds a 70% working interest; while Marathon holds the remaining interest.

Discovered in 1992, the Foinavan field is estimated to hold up to 1 billion barrels of oil. The field's reservoir is Paleocene in age and compromises channelized, siliciclastic turbidities with three main oil-containing sandstone intervals. In order to recover oil from the reservoir, hydrocarbon production volumes are replaced by injecting seawater into the reservoir via dedicated water injection wells.

Field Development

Sanctioned in October 1994, Foinaven's initial field development consisted of three wells tied-back to the Petrojarl Foinaven FPSO through a 4-mile-long (7-kilometer-long) production flowline.

The subsea layout consists of two drilling centers, which contain a manifold and a well cluster that are connected to a riser base by four rigid steel production/test flowlines. Eight flexible production risers, a water injection riser, a gas injection riser and two control umbilicals hang from the turret, which provides the connection from the FPSO to the subsea system.

The Petrojarl Foinaven FPSO, operated by Teekay Petrojarl, has an overall length of 787 feet (240 meters) and a displacement of 72,000 tons (65,317 tonnes). The vessel is a converted five-year submarine tender that underwent a major conversion by PGS Production at the Ferrol yard in Spain during 1995 and 1996. The modified FPSO has a storage capacity of 300,000 barrels and is turret-moored on the Foinaven field with production exported by two shuttle tankers.

The field commenced production in 1997 and four years later the vessel set a daily production record of 132,000 bopd. From the time the field commenced production, the partners continued to explore the area because additional opportunities were identified. By 2003, the field was fully developed by 32 subsea wells connected to four drilling centers. By adding to the field's subsea layout, Foinaven's initial reserves doubled from 200 million barrels oil equivalent to around 415 million barrels of oil equivalent.

Activities
Status Updates
BP Shuts-in Production at Foinaven
Type: Status Update

Jan. 2012 - BP has halted production at its Foinaven field after a hairline crack was discovered in an underwater connecting pipeline. Production was immediately shut down and the leak was stopped, said the company. The field, which produces around 43,000 bopd, remains shut-in, and the company is unsure when production will resume. Foinaven was the UK's first deepwater field and came online in mid-2000.

BP Taps GE O&G for 2 Engineering Studies at Offshore Foinaven Field
Type: Contract Award

Jun. 2009 - GE was selected by BP to conduct two initial engineering studies for the Foinaven oil field, for subsea processing and power-from-shore systems, respectively. The initial engineering studies, which will involve obtaining accurate data for field development and its technical and commercial feasibility, represent a continuation of work already completed by GE Oil & Gas to support BP in developing the Foinaven field for future production enhancement. The target completion date for the initial engineering studies is the third quarter of 2009. The Foinaven oil fields are located 118 miles (190 kilometers) west of the Shetland Islands, UK, in water depths of 1,312 and 1,969 feet (400 and 600 meters).

Petrojarl Foinaven FPSO
Suspended - Jan 30, 2012 to -

Production at a BP PLC-run oil and gas field in the North Sea has been halted after a hairline crack was discovered in an underwater connecting pipeline

Producing - Nov 26, 1997 to Jan 29, 2012

Foinaven
Suspended - Jan 30, 2012 to -

Production at a BP PLC-run oil and gas field in the North Sea has been halted after a hairline crack was discovered in an underwater connecting pipeline.

Producing - Nov 1997 to Jan 29, 2012

The development of the field was sanctioned in 1994 and the oil production in Foinaven started in November 1997.

Discovery (Drilled) - Oct 1992 to Oct 1997

Foinaven oil field was discovered in October 1992.

Update History
The SubseaIQ Team works everyday to provide you with the latest information on the offshore field development market. The following table provides you with a detailed record of each addition and update made to this project by the SubseaIQ team.
UPDATE TYPE DATE DAYS AGO
Field Updated Jan 30, 2012 478
Project Description Updated Jan 30, 2012 478
Field Status Updated Jan 30, 2012 478
Field Status Added Jan 30, 2012 478
Facility Status Updated Jan 30, 2012 478
Facility Status Added Jan 30, 2012 478
Activity Added Jan 30, 2012 478
Project Description Updated Jan 20, 2011 853
Project Description Updated Jul 27, 2009 1395
Project Description Added Jun 17, 2009 1435
Activity Added Jun 16, 2009 1436
Field Added Jun 16, 2009 1436
Facility Added Jun 16, 2009 1436
Facility Status Added Jun 16, 2009 1436
Field Status Updated Jun 16, 2009 1436

    Project Update History Search - View all the lastest updates made by the SubseaIQ team.
 
Project Map
Project Image
Previous Image Next Image
 
 
 
Facility Name Petrojarl Foinaven FPSO
Duty Oil/Gas
Operator BP
Current Status Suspended since 2012
Host Type FPSO
Water Depth 450 m / 1,485 ft
Dev.Cost n/a
 
Region UK
 
Location 204/19, 204/24a
 
Field Name Foinaven
Discovery Date Oct 1992
Block 204/19, 204/24a
Reserve Type Oil/Gas
Current Status Suspended
Production Start Nov 1997
Water Depth 600 m / 1,980 ft