Project Description
The Rhyl field lies in the east Irish North Sea on Block 113/27b in 89 feet (27 meters) of water. Centrica wholly owns and operates the field.

Rhyl is a gas field that was discovered in 2009. The operator submitted a drilling operations environmental statement to DECC for the field's development in January 2011.

Field Development

The Rhyl development will consist of a single production well connecting to the North Morecambe Drilling and Production Platform, located in Block 110/2, via a 8-mile-long (12.7-kilometer-long), 12 inch flexible export flowline and control umbilical.

Gas from Rhyl will be exported onshore to the North Morecambe gas terminal in Barrow via the existing 36-inch, 23-mile (37-kilometer) long North Morecambe ...
The Rhyl field lies in the east Irish North Sea on Block 113/27b in 89 feet (27 meters) of water. Centrica wholly owns and operates the field.

Rhyl is a gas field that was discovered in 2009. The operator submitted a drilling operations environmental statement to DECC for the field's development in January 2011.

Field Development

The Rhyl development will consist of a single production well connecting to the North Morecambe Drilling and Production Platform, located in Block 110/2, via a 8-mile-long (12.7-kilometer-long), 12 inch flexible export flowline and control umbilical.

Gas from Rhyl will be exported onshore to the North Morecambe gas terminal in Barrow via the existing 36-inch, 23-mile (37-kilometer) long North Morecambe gas pipeline.

First gas is expected in July 2012.
Activities
Status Updates
Centrica Announces Start of Production at Rhyl
Type: Production Start

Apr. 2013 - Centirca announced the start of production from the Rhyl field 24 miles off the coast of Barrow in UK license P1483. Gas from Rhyl is produced from a subsea tieback through the Centrica-owned North Morecambe platform and is then sent by pipeline to the Barrow complex onshore for processing. Centrica is the sole interest holder in the license and expects the addition of Rhyl's production to carry its Morecambe Bay operation well beyond 2020. Recent appraisal drilling on the Rhyl reservoir confirmed it extends further than originally thought and served to increase 2P reserves to around 80 Bcf.

Centrica Approves Rhly Development in East Irish Sea
Type: Status Update

Jul. 2011 - Centrica has approved the US $138.5 million development of the Rhyl field in the East Irish Sea, off northwest England. The operator expects to commence production from the field in 2012.

Rhyl
Producing - Apr 2013 to -

Under Development - Jul 2011 to Apr 2013

First gas is expected in July 2012.

Discovery (Drilled) - Dec 21, 2009 to Mar 2010

Centrica discovered gas in its Rhyl exploration project in the East Irish Sea. On testing, the well flowed at a rate of .4 MMcm/d.

Update History
The SubseaIQ Team works everyday to provide you with the latest information on the offshore field development market. The following table provides you with a detailed record of each addition and update made to this project by the SubseaIQ team.
UPDATE TYPE DATE DAYS AGO
Facility Updated Apr 12, 2013 42
Field Status Updated Apr 04, 2013 50
Field Status Added Apr 04, 2013 50
Field Updated Apr 04, 2013 50
Facility Updated Apr 04, 2013 50
Activity Added Apr 04, 2013 50
Field Updated Apr 02, 2013 52
Field Updated Jun 18, 2012 340
Project Description Updated Jun 18, 2012 340
Facility Added Jun 18, 2012 340
Facility Status Added Jun 18, 2012 340
Field Status Updated Jun 18, 2012 340
Field Updated Apr 17, 2012 402
Project Description Added Apr 17, 2012 402
Field Added Aug 16, 2011 647
Field Status Added Aug 16, 2011 647
Field Status Updated Aug 16, 2011 647
Field Updated Aug 16, 2011 647
Activity Added Jul 29, 2011 665

    Project Update History Search - View all the lastest updates made by the SubseaIQ team.
 
 
 
Field Name Rhyl
Discovery Date Dec 2009
Block P1483, 113/27b
Reserve Type Gas
Current Status Producing
Production Start Apr 2013
Water Depth 27 m / 89 ft