Dumbarton
Operator:Maersk Oil
Water Depth:140 m / 462 ft
Region:Europe - North Sea
Country:UK
Last Updated:Feb 28, 2013    (view update history)
Project Description
The Dumbarton field is situated on Blocks 15/20a and 15/20b in the UK sector of the North Sea in 459 feet (140 meters) of water. Formerly named Donan, Dumbarton is located 140 miles (225 kilometers) northeast of Aberdeen, Scotland and is owned and operated by Maersk Oil North Sea Limited.

Dumbarton was discovered by well 15/20a-4 in 1987 and appraised by well 15/20a-6 in 1990. Production from these two wells commenced in 1992 and produced until 1997, totaling an output of 15.3 million barrels of oil. After failed attempts of replacing the production wells with new ones, the operator decided to cancel any further development enhancements and abandoned the field in 1998.

Field Development

Maersk Oil acquired Dumbarton in November 2005 with ...
The Dumbarton field is situated on Blocks 15/20a and 15/20b in the UK sector of the North Sea in 459 feet (140 meters) of water. Formerly named Donan, Dumbarton is located 140 miles (225 kilometers) northeast of Aberdeen, Scotland and is owned and operated by Maersk Oil North Sea Limited.

Dumbarton was discovered by well 15/20a-4 in 1987 and appraised by well 15/20a-6 in 1990. Production from these two wells commenced in 1992 and produced until 1997, totaling an output of 15.3 million barrels of oil. After failed attempts of replacing the production wells with new ones, the operator decided to cancel any further development enhancements and abandoned the field in 1998.

Field Development

Maersk Oil acquired Dumbarton in November 2005 with the idea to redevelop it, which the government sanctioned on March 19, 2006. The field will be developed in phases but in total, Dumbarton will consist of eight production wells and up to two produced water disposal wells on the field and the nearby Lochranza field.

In January 2006, Maersk commenced the first phase of the redevelopment project by drilling five horizontal producers and one deviated produced water injection well, and tying them back to the Global Producer III FPSO. Production commenced in the first quarter of 2007. On September 23, 2008, two additional production wells and one deviated-water-injection well were brought online, bringing the field's total production to 40,000 bopd.

The second phase of development calls for a second drilling center, located close to the first, consisting of a subsea manifold with up to three subsea producers clustered around it and a fourth remote producer tied-back by a 2 mile (4 kilometer), 8-inch-diameter flowline. Also, a third water injection well will be added to the development program, and all five of the wells will be tied-back to the Global Producer III FPSO. This phase of development commenced on October 2009.

At the end of December 2009, Lochranza, a satellite field, was tied into Dumbarton and came online. Further plans include drilling a second well in the early part of 2010.
Activities
Status Updates
Maersk Oil Announced First Oil from Balloch
Type: Production Start

Feb. 2013 - The UK Department of Energy and Climate Change granted approval for a Field Development Plan concerning the Balloch field in the Central North Sea. Maersk Oil holds a 100% interest in the field which is situated near the company's highly successful Dumbarton development. Initial production will be from one well tied-back to the Global Producer III FPSO that currently serves the Dumbarton and Lochranza fields. A second development well is in the planning stage. Total reserves from the two wells are estimated at 9 barrels of oil.

Noble Offloads Dumbarton and Lochranza to Maersk
Type: Operator Update

May. 2012 - Noble Energy, Inc. announced that it entered into an agreement with Maersk Oil North Sea Limited for the sale of its thirty percent non-operated working interest in the Dumbarton and Lochranza properties. These fields produced approximately 4,400 barrels of oil equivalent (boe) per day, net to Noble, in the first quarter of 2012. At the end of 2011, net proved reserves at Dumbarton and Lochranza were 5.6 million boe. Noble will receive $127 million, subject to customary adjustments for net cash flows between the effective date of January 1, 2012 and the closing date, which is expected before October 2012.

Maersk Kicks Off Production at Dumbarton's $600MM Extension Project
Type: Status Update

Sep. 2008 - Maersk has started production from the first phase of a $600 million major extension of its Dumbarton field project. The first two wells in the extension project have increased the total field production to over 40,000 bopd.

Balloch
Producing - Feb 2013 to -

Lochranza
Producing - Under Dev. - Dec 31, 2009 to -

The first well at the nearby Lochranza field was tied into Dumbarton and came online at the end of 2009, with plans to add a second well in the early part of 2010.

Under Development - Nov 11, 2009 to Dec 2009

Global Producer III FPSO
Producing - Sep 2008 to -

Dumbarton
Producing - Sep 2008 to -

Under Development - Apr 2006 to Sep 2008

Plan consists of 6wells and development drillng. Wells to be tied back to the Global Producer III FPSO facility. The Dumbarton project is a redevelopment of the abandoned Donan field.

Exploratory Drilling - Apr 18, 1987 to May 13, 1987

Original discovery well 15/20a-4. This field was named Donan later to be abandoned and redevloped as Dumbarton field.

Update History
The SubseaIQ Team works everyday to provide you with the latest information on the offshore field development market. The following table provides you with a detailed record of each addition and update made to this project by the SubseaIQ team.
UPDATE TYPE DATE DAYS AGO
Field Added Feb 28, 2013 83
Field Status Added Feb 28, 2013 83
Activity Added Feb 28, 2013 83
Field Updated Aug 15, 2012 280
Facility Updated Aug 15, 2012 280
Project Description Updated Aug 15, 2012 280
Project Description Updated Jun 04, 2012 352
Field Updated May 31, 2012 356
Project Description Updated May 31, 2012 356
Activity Added May 30, 2012 357
Field Updated May 05, 2011 748
Project Description Updated Feb 17, 2011 825
Field Status Updated Feb 24, 2010 1183
Field Status Added Feb 24, 2010 1183
Project Description Updated Feb 24, 2010 1183
Project Description Updated Jan 22, 2010 1216
Project Description Added Jan 13, 2010 1225
Field Added Jan 12, 2010 1226
Field Status Added Jan 12, 2010 1226
Field Updated Jan 12, 2010 1226
Facility Updated Jan 12, 2010 1226
Field Updated Apr 20, 2009 1493
Facility Updated Apr 20, 2009 1493
Facility Status Added Oct 23, 2008 1672
Facility Added Oct 23, 2008 1672
Activity Added Sep 23, 2008 1702
Field Added Sep 23, 2008 1702
Field Status Added Sep 23, 2008 1702

    Project Update History Search - View all the lastest updates made by the SubseaIQ team.
 
Project Image
Previous Image Next Image
 
 
 
Facility Name Global Producer III FPSO
Duty Oil
Operator Maersk Oil
Current Status Producing since 2008
Host Type FPSO
Water Depth 140 m / 462 ft
Dev.Cost n/a
 
Region UK
 
Location 15/20a. 15/20b
 
Field Name Dumbarton
Discovery Date May 1987
Block 15/20a. 15/20b
Reserve Type Oil
Current Status Producing
Production Start Sep 2008
Water Depth 140 m / 462 ft
Field Name Lochranza
Discovery Date
Block 15/20a
Reserve Type n/a
Current Status Producing - Under Dev.
Production Start
Water Depth n/a
Field Name Balloch
Discovery Date
Block P1041, 15/20a
Reserve Type Oil
Current Status Producing
Production Start Feb 2013
Water Depth 142 m / 469 ft