The Alvheim field is located on Production License 203 and extends into neighboring PL088 and PL036. The field is situated on the Norwegian Continental Shelf, west of Haugesund and close to the UK border in a water depth of 125 meters (410 feet).
The field consists of three principal oil and gas discoveries named Kneler, Kamelion and Boa, each of which contains hydrocarbons in the Paleocene sandstones. Although the accumulations were discovered in 1974, and another one in 1992, the area lay dormant until acquired by the current operator, Marathon. In 1998, drilling began, and it is estimated the field contains resources of up to 180 million boe. The development plan for production was approved in 2004.
Marathon holds a 65% interest in the Alvheim field and serves ...
The Alvheim field is located on Production License 203 and extends into neighboring PL088 and PL036. The field is situated on the Norwegian Continental Shelf, west of Haugesund and close to the UK border in a water depth of 125 meters (410 feet).
The field consists of three principal oil and gas discoveries named Kneler, Kamelion and Boa, each of which contains hydrocarbons in the Paleocene sandstones. Although the accumulations were discovered in 1974, and another one in 1992, the area lay dormant until acquired by the current operator, Marathon. In 1998, drilling began, and it is estimated the field contains resources of up to 180 million boe. The development plan for production was approved in 2004.
Marathon holds a 65% interest in the Alvheim field and serves as the operator. Norske ConocoPhillips AS has a 20% working interest, and Lundin Norway AS has the remaining 15% interest.
Field Development
Alvheim consists of 10 producing wells and two water disposal wells in the Phase 1 portion of the drilling, with first production commencing by the end of 2008. Shortly after, phase 2 began in 2009 to further produce more wells on the field.
The engineering, procurement, construction, installation and commissioning (EPCIC) contract for the development of the field was awarded to Vetco Aibel of Norway for topside work related to the FPSO, which is a central element of the Alvheim development. The total value of the contract was $350 million (2.2 billion NOK).
The Alvheim FPSO has a capacity of 120,000 bopd and 125 Mmcf/d (3.5 MMcm/d) with total storage capacity of 560,000 barrels of oil. It is a centrally located hub, situated about 140 miles (225 kilometers) from Stavanger, Norway, in approximately 400 feet (125 meters) of water. It is also equipped to produce low emission gas turbines, which is a first on the Norwegian Continental Shelf.
The Alvheim FPSO is a conversion of the multipurpose shuttle tanker (MST) Odin. In 2004, Marathon signed a contract with APL for the turret mooring system for the Alvheim FPSO, an STP system for permanent mooring of the MST. The system has 14 slots through the turret to accommodate the risers and umbilical for the initial subsea wells and for planned expansions. Twelve lines moor the vessel in an arrangement designed to withstand a 100-year storm and 14.6-meter (47.90 feet) waves.
The length of the FPSO is 827 feet (252 meters) with a design draft of 49 feet (15 meters). The gas compression will produce 125 MMcf/d (3.5 MMcm/d), and water injection will produce 130,000 bwpd. The lifetime of the field is 25 years.
In addition to the Odin FPSO, the development includes a subsea infrastructure that is compromised of five drill centers and associated flow lines.
Gas and oil is transported to an existing UK Scottish Area Gas Evacuation system using a 14-inch diameter, 24-mile (39-kilometer) cross-border pipeline.
Vilije Field
The Vilije field is located in PL 036, and it is expected to reach peak net production of 75,000 boepd by early 2009. Marathon, operator, holds 46.9% interest in the field, which is a subsea development tie-back to the Alvheim field. Statoil has a 29% interest and Total E&P Norge AS has the remaining 24% interest.
Volund
The Volund satellite field is located in PL 150, roughly 5 miles (8 kilometers) south of the Alvheim field on Block 24/9. Marathon serves as the operator and holds a 65% interest; Lundin Norway AS holds the remaining 35% interest.
Receiving governmental approval for field development in January 2007, the plan calls for four subsea wells, three for production and one for water injection, tied-back to the Alvheim FPSO.
Volund's oil will be sent via the Alvheim blend and exported via shuttle tankers, and associated gas will be exported via the Alvheim-to-SAGE pipeline.
Production commenced on Sept. 16, 2009, and will produce roughly 20,000 to 40,000 bopd.
Marihone
The Marihone prospect is located in Production License 340 in 394 feet (120 meters) of water in the North Sea. Marathon serves as the operator of the prospect and holds a 65% interest; ConocoPhillips holds 20%; and Lundin holds the remaining 15%.
In September 2009, Marathon received approval to conduct exploratory drilling on the Marihone prospect using the Songa Dee semisub on exploration well 24/9-9 S. Drilling is expected to commence in the fourth quarter of 2009 and last roughly 36-53 days.
If drilling is successful, the prospect may be tied-back to the Alvheim FPSO.
|
|
|
Lundin Receives Boyla PDO Approval
Type: Development Activity
Oct. 2012 - The Norwegian Ministry of Petroleum and Energy granted approval to Lundin Petroleum for the Plan of Development and Operation of the Boyla field in PL 340 offshore Norway. Estimated gross reserves are roughly 21Mmboe with gross peak production of 19,000 Boepd. Boyla will be developed via a subsea tie-back to the Alvheim FPSO. Technip was awarded the field development contract and will handle construction and installation of the subsea equipment.
|
|
|
|
Marathon Receives PSA Consent for Vilje
Type: Operator Update
Oct. 2012 - Consent has been granted by the Petroleum Safety Authority Norway (PSA) allowing Marathon Oil to assume operatorship of the Vilje field in block 25/4 of production license 036D. Vilje has been developed via two subsea wells connected to the Alvheim FPSO. Marathon is now the operator of three producing fields offshore Norway. Partners in the field consist of Statoil with a 28.8% stake and a 25.2%-stake for Total. Additionally, the partners have decided to develop Vilje South through a single development well and standard subsea template.
|
|
|
|
Marathon Receives Consent to Operate Vilje
Type: Operator Update
Oct. 2012 - Consent has been granted by the Petroleum Safety Authority Norway (PSA) allowing Marathon Oil to assume operatorship of the Vilje field in block 25/4 of production license 036D. Vilje has been developed via two subsea wells connected to the Alvheim FPSO. Marathon is now the operator of three producing fields offshore Norway. Partners in the field consist of Statoil with a 28.8% stake and a 25.2%-stake for Total. Additionally, the partners have decided to develop Vilje South through a single development well and standard subsea template.
|
|
|
|
Technip to Expand Drill Centers in the Alvheim Area
Type: Subsea Equipment
Jul. 2012 - Marathon has awarded Technip a contract to work on the ongoing expansion of the subsea drill centers at Kneler B and Volund in the Alvheim area of the Norwegian sector of the North Sea. The contract includes engineering, fabrication, installation and diving tie-ins of pipeline spools, including protection covers and installation of a manifold. The offshore construction work will take place in 2012 and 2013.
|
|
|
|
Technip to Construct Subsea System for Boyla Development
Type: Contract Award
Jun. 2012 - Technip won a contract for the development of the Boyla field in the Norwegian sector of the North Sea. The $381 million deal with Marathon covers all activities necessary to complete the construction of the subsea system for the field development and connect it to the existing Alvheim subsea facilities. Offshore construction will take place in 2014. The field is to be developed as a subsea tie-back to the Alvheim FPSO, with two production wells and a water injection well. The Boyla field is estimated to hold reserves of 23 million barrels of oil equivalent.
|
|
|
|
Bridge Energy Acquires Stake in Boa Field
Type: Acreage Acquisition
Jun. 2012 - Bridge Energy has signed a Sale and Purchase Agreement to acquire a 1.55 percent working interest in the producing Boa field from OMV Limited for a consideration of $18.1 million. The interest will add production of 250 bopd to Bridge. The unitized field extends across the UK/Norway median line and lies 88.65 percent in Norway Block 24/6 and 11.35 percent in UK Blocks 9/15a and 9/15b. The field was developed in 2008 as part of the wider Alvheim area development with three subsea development wells tied-back to the Alvheim FPSO operated by Marathon. Oil from Boa is shipped by shuttle tanker while gas is exported into the UK market via the Beryl SAGE system. The field is expected to produce until 2022.
|
|
|
|
Marathon Submits Boyla PDO to Norwegian Authorities
Type: Development Activity
Jun. 2012 - Marathon and partners have submitted a plan for development and operation (PDO) of the Boyla field (formerly Marihone) to the Norwegian Ministry of Petroleum and Energy. The Boyla development is expected to begin production during the fourth quarter of 2014. The field will be developed as a subsea tie-back to the Alvheim floating production, storage and offloading vessel (FPSO) with two production wells and a water injection well being drilled. The total investment is estimated to be $867 million with reserves estimated at 23 million barrels of oil equivalents. Boyla crude oil will be commingled with the Alvheim blend and exported via shuttle tankers. Associated gas will be exported via Alvheim to the SAGE pipeline.
|
|
|
|
Marathon Takes Reins at Vilje Field
Type: Status Update
May. 2012 - Statoil has transferred operatorship of the Vilje field in the North Sea to Marathon Oil. The agreement does not involve any change of stakes in Production License 036D.
|
|
|
|
Marathon to Submit Boyla POD
Type: Status Update
Apr. 2012 - Marathon expects to submit a plan of development for the Boyla field subsea tie-back to the Alvheim FPSO in the first half of 2012. First oil is expected in 2014.
|
|
|
|
Technip Wins Statoil Subsea Work
Type: Subsea Equipment
Jan. 2012 - Technip received two contracts for the Vilje South and Visund North developments in the North Sea in water depths of 394 and 1,263 feet (120 and 385 meters). These contracts cover welding and installation of a 6-mile-long (10-kilometer-long) production flowline; subsea equipment installation and tie-ins; and umbilical installation and tie-ins. Installation will occur in mid-2013.
|
|
|
|
Aker to Supply Production System for Boyla Development
Type: Status Update
Jan. 2012 - Marathon awarded Aker Solutions a contract to supply a subsea production system for the Boyla (formerly Marihone) development in the Norwegian sector of the North Sea. The scope of work includes engineering, procurement, construction and delivery of four subsea trees, four over-trawlable subsea structures and control systems. Final deliveries will be made in 1Q 2013. The Boyla field, located in Production License 340 in 394 feet (120 meters) of water, will be subsea tied-back to the Alvheim FPSO. Marathon operates the project with a 65 percent interest; while ConocoPhillips holds 20 percent; and Lundin holds 15 percent.
|
|
|
|
Statoil Hands Aker Subsea Contract
Type: Subsea Equipment
Dec. 2011 - Statoil awarded Aker Solutions a contract for the engineering, procurement and construction of a subsea production system for the Vilje South project in the Norwegian sector of the North Sea. The scope of work includes a subsea tree, satellite production flowbase and protection structure, subsea production control system, wellhead system, remote connection system and a 492-foot (150-meter) static umbilical. Final deliveries will be made in 2Q13. Statoil operates the field with a 28.5 percent; while Marathon holds 49.9 percent; and Total holds the remaining 24.2 percent.
|
|
|
|
Statoil Fast-Tracks Vilje South
Type: Status Update
Nov. 2011 - Statoil plans to fast-track its Vilje South satellite field, which is the third producer in the Vilje development. It is intended that this development will secure optimum drainage of its resources. The development compromises a standard subsea template with a single well, connecting to Marathon’s Alvheim field via a 12 miles (19-kilometer) flowline and umbilical. The subsea template is currently being constructed by Aker for installation in 2013, together with the rest of the subsea equipment. Statoil plans to conduct drilling work in two stages, starting in 2013 with completion that same year. The field is slated to commence production in 2013. Recoverable reserves in Vilje South are estimated at 7.6 million barrels of oil equivalent, mainly in the form of crude. Statoil operates the field with a 28.5 percent; while Marathon holds 49.9 percent; and Total holds the remaining 24.2 percent.
|
|
|
|
Marathon Resumes Production at Alvheim, Volund offshore Norway
Type: Status Update
May. 2011 - Lundin Petroleum reported that production was halted from the Alvheim field and the Volund field, offshore Norway. The fields were shut down for 13 days in May due to unscheduled maintenance on the Alvheim FPSO. Following preventative maintenance work on the vessel's fire prevention system, the fields have recommenced production. Marathon holds a 65% interest in the Alvheim field and serves as the operator. Norske ConocoPhillips AS has a 20% working interest and Lundin Norway AS has the remaining 15% interest.
|
|
|
|
Marathon Receives Consent for Use of Songa Dee on Alvheim
Type: Development Activity
Oct. 2010 - Marathon received consent to use the Songa Dee semisub for production drilling on the Alvheim field. During the first quarter of 2010, Marathon received consent to drill and complete three oil producing wells, 24/6-B-4, 25/4-L-1, and 25/4-L-2, on Alvheim, and this new consent is an expansion and applies to well 25/4-L-3. The water depth at the site is 404 feet (123 meters). The Alvheim field is located on Production License 203 and extends into neighboring PL088 and PL036. The field is situated on the Norwegian Continental Shelf, west of Haugesund and close to the UK border in a water depth of 125 meters (410 feet). Marathon holds a 65% interest in the Alvheim field and serves as the operator. Norske ConocoPhillips AS has a 20% working interest, and Lundin Norway AS has the remaining 15% interest.
|
|
|
|
PSA Grants Consent to Marathon for Underwater Operations
Type: Contract Award
Jun. 2010 - The Petroleum Safety Authority Norway gave consent to Marathon Petroleum Norge AS to carry out manned underwater operations on the Volund and Alvheim fields in the Norwegian sector of the North Sea. The consent relates to carrying out manned underwater operations in 2010, and also includes well work, necessary inspections, repairs and maintenance on both fields.
|
|
|
|
Marathon Gets Consent for Alvheim Phase II Drilling Program
Type: Development Activity
Apr. 2010 - Marathon received approval to use the Songa Dee semisub to conduct production drilling on the Alvheim field. The consent relates to the drilling of wells 24/6-B-4, 25/4-L-1 and 25/4-L-2 in PL 203, which will constitute phase II of the drilling program for the oil and gas field. Drilling operations are scheduled to start in May 2010 and last for roughly 300 days. Alvheim, located in a water depth of 410 feet (125 meters) in the Norwegian North Sea, is operated by Marathon, holding a 65% interest.
|
|
|
|
Marathon to Carry Out ST Drilling Using Songa Dee Semisub
Type: Status Update
Oct. 2009 - Marathon Petroleum was granted consent to carry out exploration drilling in the northern North Sea with the Songa Dee, a 3rd generation, midwater semisubmersible. The consent is an amendment of our previous consent to drill exploration well 24/9-9 S and applies to the drilling of sidetrack well 24/9-9 B.
|
|
|
|
Marathon Gets Go-Ahead to Use Songa Dee for Volund Phase 1B
Type: Development Activity
Oct. 2009 - Marathon has secured consent to use the Songa Dee, a 3rd generation, midwater semisubmersible, for production drilling on the Volund field for Phase 1B of field development. The Volund oil field lies in the northern North Sea, about 5 miles (8 kilometers) south of Alvheim in Block 24/9. The field is part of PL 150, and the licensees are Marathon (operator) and Lundin Norway AS.
|
|
|
|
Marathon Pumps First Oil from Volund on Norwegian Shelf
Type: Production Start
Sep. 2009 - Marathon Oil announced that the Volund development offshore Norway has achieved first production. Volund is the second tie-back to the Alvheim FPSO, following Vilje; and it firmly establishes the FPSO as a new oil processing hub in the Norwegian Continental Shelf. The Volund field is expected to reach a peak oil production of approximately 25,000 bopd, the timing of which is subject to available processing capacity on the Alvheim FPSO.
|
|
|
|
MPN Gets Go-Ahead for North Sea Exploration Drilling
Type: Status Update
Sep. 2009 - Marathon Petroleum was granted consent to carry out exploration drilling in the northern North Sea with the Songa Dee semisub on the Marihone field. The consent applies to drilling of exploration well 24/9-9 S, which is part of PL 340. The well has the following geographical coordinates: N 59 degrees 19' 40.414", E 01 degrees 50' 17.110". The water depth at the site is 394 feet (120 meters). The drilling is scheduled to start in September/October 2009. The activity has an estimated duration of 36-53 days.
|
|
|
|
Marathon to Take Reins at Alvheim
Type: Operator Update
Sep. 2009 - Once its service agreement with AP Moller-Maersk A/S is terminated, Marathon will assume management of operations and staffing at the Alvheim field, according to a report by Dow Jones Newswires. Marathon intends to directly staff and operate the floating production storage and offtake vessel at Alvheim from the second half of 2010, the report noted. Operated by Marathon with a 65% interest, Alvheim commenced production in June 2008, and output has stabilized at 140,000 boepd, or over its designed capacity of 120,000 boepd.
|
|
|
|
Marathon Gets Consent to Start-Up Installations at Volund
Type: Development Activity
Jul. 2009 - Marathon was granted consent to start-up and operate the installations on the Volund field. The Volund oil field is located in the North Sea about 5 miles (8 kilometers) south of Alvheim on Block 24/9. The field was developed with four subsea wells (three for production and one for injection), tied-in to Alvheim FPSO. According to Marathon, the wells will produce between 20,000 and 40,000 bopd.
|
|
|
|
MCS Reels in Subsea Contract for Services at Norway's Volund Field
Type: Pipeline Construction
Aug. 2008 - MCS was awarded a significant subsea contract from Acergy to perform detailed upheaval buckling analysis of a water injection flowline located in the Volund Field, offshore Norway.
|
|
|
|
Vilje Starts Up Production in the Northern North Sea
Type: Production Start
Aug. 2008 - StatoilHydro says that first oil flowed from the Vilje field to the Alvheim FPSO today, August 1, 2008. The Vilje field is located in the northern part of the North Sea, north of the Heimdal field.
|
|
|
|
StatoilHydro Gets Go-Ahead on Vilje Installations
Type: Development Activity
Jun. 2008 - StatoilHydro has received consent to use installations on the Vilje field, a small oil field located in the northern part of the North Sea, immediately north of the Heimdal field. The consent applies to start-up and operation of Vilje satellite wells and associated pipelines between the wells and FPSO Alvheim (see map), operated by Marathon Petroleum Company Norway.
|
|
|
|
Aker Solutions awarded Alvheim subsea deal
Type: Contract Award
Jun. 2008 - Aker Solutions has been awarded a contract to deliver additional subsea well sets for phase two of the Marathon Oil Corporation (NYSE: MRO) led Alvheim development on the Norwegian continental shelf. The contract is worth approximately GBP 18 million.
|
|
|
|
Marathon Starts Up Production at Alvheim
Type: Production Start
Jun. 2008 - Marathon Oil Corporation, through its wholly owned subsidiary Marathon Petroleum Norge AS, announced with its partners that the Alvheim development offshore Norway has achieved first production. The Company expects the combined Alvheim and Vilje projects to reach peak net production of approximately 75,000 barrels of oil equivalent (boe) per day by early 2009.
|
|
|
|
Marathon Says Alvheim Delays Due to Tight Oil Services Market
Type: Status Update
Mar. 2007 - The tight market for oil services equipment and personnel on the Norwegian continental shelf was a key contributor in the delayed startup of Marathon Norway's (MRO) 120,000 barrel-a-day Alvheim oil development, managing director Roger Wilson said Thursday.
|
|
|
Boyla (Marihone)
|
|
Under Development - Jun 20, 2012 to -
|
|
Discovery (Appraised) - Oct 2009 to Jun 19, 2012
Well 24/9-9B was drilled to TD 6866' and confirmed oil.
|
|
Appraisal Drilling - Oct 2009 to Oct 2009
Songa Dee drilled appraisal well 24/9-9B.
|
|
Appraisal Drilling - Oct 2009 to Oct 2009
Songa Dee drilled appraisal well 24/9-9A, well confirmed oil.
|
|
Exploratory Drilling - Sep 2009 to Oct 2009
Songa Dee semisub to drill exploration well 24/9-9 on the Marihone field.
|
|
Bright Spot - 2009 to Sep 2009
|
|
|
Vilje South
|
|
Under Development - Nov 23, 2011 to -
The well planned for Vilje South will represent the third producer in this development, and is intended to secure optimum drainage of its resources.
|
|
Appraisal Drilling - Jan 02, 2010 to Nov 2011
|
|
Discovery (Drilled) - 2008 to Jan 01, 2010
|
|
|
Alvheim FPSO
|
|
Producing - Jun 2008 to -
|
|
Under Construction - Oct 06, 2004 to Jun 2008
Alvheim will be developed using a production vessel and subsea wells. The oil will be stabilised and stored in the production vessel
|
|
|
Vilje
|
|
Producing - Aug 2008 to -
|
|
Under Development - Mar 18, 2005 to Jun 2008
The field will be developed with two subsea wells connected to Alvheim.
|
|
Discovery (Drilled) - Sep 30, 2003 to Mar 17, 2005
The well was permanently abandoned on 29 September 2003 as an oil discovery (the Vilje Discovery).
|
|
Exploratory Drilling - Sep 05, 2003 to Sep 29, 2003
Wildcat well 25/4-9 S was spudded with the semi-submersible installation Deepsea Delta on 5 September 2003 and drilled to TD at 2377 m in the Paleocene Heimdal Formation.
|
|
|
Alvheim
|
|
Producing - Jun 09, 2008 to -
|
|
Under Development - Oct 06, 2004 to Jun 08, 2008
Alvheim will be developed using a production vessel and subsea wells. The oil will be stabilised and stored in the production vessel.
|
|
Discovery (Appraised) - Apr 23, 2003 to Oct 05, 2004
The well was permanently abandoned as a junk well after drilling of 24/6-4 was completed. Well 24/6-4 was spudded 4/22/2003 with the Deepsea Bergen and permanently abandoned as a gas and oil discovery. Exploration well 25/4-7 was spudded with the Deepsea Bergen on 3/21/2003 and drilled to TD at 2286 m in the Paleocene Heimdal Formation. It was suspended as an oil discovery on 4/17/2003.
|
|
Appraisal Drilling - Apr 18, 2003 to Apr 22, 2003
Well 24/6-3 was spudded with the semi-submersible installation Deepsea Bergen.
|
|
Discovery (Drilled) - Jul 09, 1998 to Apr 17, 2003
Well 24/6-2 was permanently plugged and abandoned as an oil and gas discovery on 8 July 1998.
|
|
Exploratory Drilling - May 25, 1998 to Jul 08, 1998
Well 24/6-2 was drilled with the Transocean Leader and reached a total depth of 2722 m in the Paleocene VĂĄle Formation.
|
|
|
Volund
|
|
Producing - Under Dev. - Sep 16, 2009 to -
|
|
Under Development - Jan 18, 2007 to Sep 2009
The development will include three producing wells and a water injection well and is estimated to contain gross risked resources of approximately 40-50 million barrels of oil equivalent. Volund will join the Vilje Field as the second third-party field to be developed as a subsea tieback to Alvheim.
|
|
Discovery (Appraised) - Apr 12, 2004 to Jan 17, 2007
Rig operations were completed and the wells temporarily suspended on 11 April 2004. The well bores were classified as gas oil appraisal wells.
|
|
Appraisal Drilling - Mar 02, 2004 to Apr 11, 2004
A total of four wells were drilled from the surface location for 24/9-7 (the planned vertical well, an unplanned down-dip sidetrack 24/9-7 A, the planned up-dip sidetrack 24/9-7 B and a further unplanned lateral sidetrack 24/9-7 C).
|
|
Discovery (Drilled) - Jan 27, 1994 to Mar 01, 2004
Well 24/9-5 was permanently abandoned on 26 January 1994 as an oil discovery.
|
|
Exploratory Drilling - Dec 07, 1993 to Jan 26, 1994
Wildcat well 24/9-5 was spudded with the semi-submersible installation West Delta on 7 December 1993 and drilled to TD at 2860 m in the Late Cretaceous Jorsalfare Formation.
|
|
|
|
The SubseaIQ Team works everyday to provide you with the latest information on the offshore field development market.
The following table provides you with a detailed record of each addition and update made to this project by the SubseaIQ team.
|
| UPDATE TYPE |
DATE |
DAYS AGO |
| Field Updated |
Jan 07, 2013 |
137 |
|
| Field Updated |
Oct 26, 2012 |
210 |
|
| Activity Added |
Oct 26, 2012 |
210 |
|
| Field Updated |
Oct 05, 2012 |
231 |
|
| Field Updated |
Oct 01, 2012 |
235 |
|
| Activity Added |
Oct 01, 2012 |
235 |
|
| Field Status Updated |
Aug 01, 2012 |
296 |
|
| Field Status Added |
Aug 01, 2012 |
296 |
|
| Field Updated |
Aug 01, 2012 |
296 |
|
| Activity Added |
Jul 17, 2012 |
311 |
|
| Field Updated |
Jul 17, 2012 |
311 |
|
| Facility Updated |
Jul 17, 2012 |
311 |
|
| Field Updated |
Jun 20, 2012 |
338 |
|
| Facility Updated |
Jun 20, 2012 |
338 |
|
| Activity Added |
Jun 20, 2012 |
338 |
|
| Activity Added |
Jun 14, 2012 |
344 |
|
| Field Updated |
Jun 04, 2012 |
354 |
|
| Facility Updated |
Jun 04, 2012 |
354 |
|
| Activity Added |
Jun 04, 2012 |
354 |
|
| Field Updated |
May 16, 2012 |
373 |
|
| Project Description Updated |
May 16, 2012 |
373 |
|
| Facility Updated |
May 16, 2012 |
373 |
|
| Activity Added |
May 16, 2012 |
373 |
|
| Field Updated |
Apr 11, 2012 |
408 |
|
| Activity Added |
Apr 11, 2012 |
408 |
|
| Activity Added |
Jan 13, 2012 |
497 |
|
| Field Updated |
Jan 13, 2012 |
497 |
|
| Field Updated |
Jan 05, 2012 |
505 |
|
| Activity Added |
Jan 05, 2012 |
505 |
|
| Activity Added |
Dec 16, 2011 |
525 |
|
| Field Added |
Dec 13, 2011 |
528 |
|
| Field Status Added |
Dec 13, 2011 |
528 |
|
| Field Status Updated |
Dec 13, 2011 |
528 |
|
| Activity Added |
Nov 30, 2011 |
541 |
|
| Field Updated |
May 31, 2011 |
724 |
|
| Activity Added |
May 31, 2011 |
724 |
|
| Project Description Updated |
May 05, 2011 |
750 |
|
| Project Description Updated |
Nov 24, 2010 |
912 |
|
| Activity Added |
Oct 13, 2010 |
954 |
|
| Field Updated |
Oct 13, 2010 |
954 |
|
| Activity Added |
Jun 29, 2010 |
1060 |
|
| Activity Added |
Apr 07, 2010 |
1143 |
|
| Field Updated |
Apr 07, 2010 |
1143 |
|
| Project Description Updated |
Mar 16, 2010 |
1165 |
|
| Project Description Updated |
Feb 08, 2010 |
1201 |
|
| Field Status Updated |
Dec 16, 2009 |
1255 |
|
| Field Status Added |
Dec 16, 2009 |
1255 |
|
| Field Updated |
Dec 16, 2009 |
1255 |
|
| Field Status Updated |
Nov 09, 2009 |
1292 |
|
| Field Status Updated |
Nov 03, 2009 |
1298 |
|
| Field Status Added |
Nov 03, 2009 |
1298 |
|
| Field Updated |
Nov 03, 2009 |
1298 |
|
| Field Status Updated |
Oct 21, 2009 |
1311 |
|
| Field Updated |
Oct 21, 2009 |
1311 |
|
| Activity Added |
Oct 21, 2009 |
1311 |
|
| Activity Added |
Oct 19, 2009 |
1313 |
|
| Field Updated |
Sep 16, 2009 |
1346 |
|
| Field Status Updated |
Sep 16, 2009 |
1346 |
|
| Field Status Added |
Sep 16, 2009 |
1346 |
|
| Project Description Updated |
Sep 16, 2009 |
1346 |
|
| Activity Added |
Sep 16, 2009 |
1346 |
|
| Field Status Added |
Sep 10, 2009 |
1352 |
|
| Field Status Updated |
Sep 10, 2009 |
1352 |
|
| Project Description Updated |
Sep 10, 2009 |
1352 |
|
| Field Updated |
Sep 10, 2009 |
1352 |
|
| Field Added |
Sep 09, 2009 |
1353 |
|
| Activity Added |
Sep 09, 2009 |
1353 |
|
| Activity Added |
Sep 01, 2009 |
1361 |
|
| Field Updated |
Jul 21, 2009 |
1403 |
|
| Project Description Updated |
Jul 21, 2009 |
1403 |
|
| Activity Added |
Jul 21, 2009 |
1403 |
|
| Field Updated |
Feb 05, 2009 |
1569 |
|
| Facility Updated |
Jan 07, 2009 |
1598 |
|
| Facility Status Added |
Dec 10, 2008 |
1626 |
|
| Project Description Added |
Nov 24, 2008 |
1642 |
|
| Activity Added |
Aug 12, 2008 |
1746 |
|
| Activity Added |
Aug 01, 2008 |
1757 |
|
| Activity Added |
Jun 24, 2008 |
1795 |
|
| Field Status Added |
Jun 24, 2008 |
1795 |
|
| Field Status Added |
Jun 11, 2008 |
1808 |
|
| Field Added |
Jun 11, 2008 |
1808 |
|
| Activity Added |
Jun 10, 2008 |
1809 |
|
| Field Status Added |
Jun 10, 2008 |
1809 |
|
| Field Status Added |
Jun 09, 2008 |
1810 |
|
| Activity Added |
Jun 09, 2008 |
1810 |
|
| Field Added |
Jun 09, 2008 |
1810 |
|
| Facility Added |
Jun 09, 2008 |
1810 |
|
| Facility Status Added |
Jun 09, 2008 |
1810 |
|
| Field Status Added |
Jun 05, 2008 |
1814 |
|
| Field Added |
Jun 05, 2008 |
1814 |
|
| Activity Added |
Mar 15, 2007 |
2262 |
|
Project Update History Search - View all the lastest updates made by the SubseaIQ team.
|
|
| Facility Name |
Alvheim FPSO |
|
| Duty |
Oil/Gas |
|
| Operator |
Marathon |
|
| Current Status |
Producing since 2008 |
|
| Host Type |
FPSO |
|
| Water Depth |
130 m / 429 ft |
|
| Dev.Cost |
n/a |
| |
| Region |
Norway |
| |
| Location |
24/6, 25/4 |
| Field Name |
Vilje |
|
| Discovery Date |
Sep 2003 |
|
| Block |
PL036 |
|
| Reserve Type |
Oil |
|
| Current Status |
Producing |
|
| Production Start |
Aug 2008 |
|
| Water Depth |
120 m / 396 ft |
| Field Name |
Alvheim |
|
| Discovery Date |
Jul 1998 |
|
| Block |
PL088, PL036 |
|
| Reserve Type |
Oil/Gas |
|
| Current Status |
Producing |
|
| Production Start |
Jun 2008 |
|
| Water Depth |
410 m / 1,353 ft |
| Field Name |
Volund |
|
| Discovery Date |
Jan 1994 |
|
| Block |
PL 150, 24/9 |
|
| Reserve Type |
Oil |
|
| Current Status |
Producing - Under Dev. |
|
| Production Start |
|
|
| Water Depth |
122 m / 403 ft |
| Field Name |
Boyla (Marihone) |
|
| Discovery Date |
Oct 2009 |
|
| Block |
PL 340 |
|
| Reserve Type |
Oil/Gas |
|
| Current Status |
Under Development |
|
| Production Start |
|
|
| Water Depth |
120 m / 396 ft |
| Field Name |
Vilje South |
|
| Discovery Date |
Jan 2008 |
|
| Block |
PL 036D |
|
| Reserve Type |
n/a |
|
| Current Status |
Under Development |
|
| Production Start |
|
|
| Water Depth |
n/a |
|