| Hoover-Diana |
 |
| Operator: | ExxonMobil |
| Water Depth: | 1,420 m / 4,686 ft |
| Region: | N. America - US GOM |
| Country: | US |
| Last Updated: | Dec 5, 2012 (view update history) |
|
The Hoover-Diana field is a deepwater GOM oil and gas development located 160 miles (257 kilometers) east of Corpus Christi, Texas. ExxonMobil, operator, has a 66.7% vested interest; BP Amoco holds the remaining 33.3% interest.
The Hoover field, about 15 miles (24 kilometers) east of the Diana field, was discovered in 1997 on Alaminos Canyon Blocks 25 and 26. Discovered in 1990, Diana is located on East Breaks Blocks 945, 946, 988, and 989.
The fields, in 4,800 feet (1,463 meters) of water, have estimated combined recoverable reserves of 300 million barrels of oil equivalent. Through an integrated development initiative, both fields came on-stream in 2000 with development costs estimated at $1.2 billion.
Field Development
The ...
The Hoover-Diana field is a deepwater GOM oil and gas development located 160 miles (257 kilometers) east of Corpus Christi, Texas. ExxonMobil, operator, has a 66.7% vested interest; BP Amoco holds the remaining 33.3% interest.
The Hoover field, about 15 miles (24 kilometers) east of the Diana field, was discovered in 1997 on Alaminos Canyon Blocks 25 and 26. Discovered in 1990, Diana is located on East Breaks Blocks 945, 946, 988, and 989.
The fields, in 4,800 feet (1,463 meters) of water, have estimated combined recoverable reserves of 300 million barrels of oil equivalent. Through an integrated development initiative, both fields came on-stream in 2000 with development costs estimated at $1.2 billion.
Field Development
The integrated field development included wells on both fields connected to a Deep Draft Caisson Vessel platform (DDCV), located in 4,800 feet (1,463 meters) of water on the Hoover field. An industry first, the DDCV set the record for water depth and associated subsea development.
The semisubmersible Marine 700 was contracted from Marine Drilling to drill the Diana and Hoover wells. In The six Diana wells were connected through a subsea manifold and flowlines to the DDCV platform 15 miles (24 kilometers) away. With subsea trees on each well, hydrocarbons are transferred from the Hoover wells to the DDCV via vertical risers.
DDCV
The DDCV platform, with drilling and production facilities, is located on the Hoover field at Alaminos Canyon Block 25. In 1999, it was towed to its offshore location, then up righted; and production decks were installed. Aker Rauma Offshore was awarded the DDCV construction.
With a catenary-moored steel cylindrical hull, the 62,000-ton vertically floating vessel is 150 feet (46 meters) in diameter and 1,019 feet (311 meters) tall. The buoyed vessel has air-filled compartments in the upper portion of the hull and is ballasted with seawater in the bottom compartments. A 17,000-ton (15,422-tonne) hull section of the DDCV was fabricated at the Aker Gulf Marine fabrication yard in Corpus Christi, Texas. The second hull section was completed at Aker Mantyluoto in Pori, Finland. The two sections were combined at the US fabrication yard prior to its launch in the GOM.
A three-level deck houses separation, dehydration and treatment facilities for 100,000 bopd, 325 MMcf/d (9.20 MMcm/d), and up to 60,000 barrels of water per day, as well as a drilling rig. The platform's topsides were designed by Mustang Engineering and fabricated by Brown and Root Energy.
Twelve 7,100-foot-long (2,164-meter-long) anchor lines moor the vessel to the seafloor; each line consists of a chain and a spiral-strand wire rope. At the time, the 105-foot-long (32-meter-long), 275-ton (249-tonne) mooring piles were the largest ever installed on an oil and gas platform. Saipem using the Saipem S-7000 vessel installed the topsides, suction pilings, mooring lines, flowlines, steel catenary risers and export lines.
Pipelines
The DDCV does not have storage capabilities to store produced hydrocarbons, instead it pumps oil and gas onshore through pipelines. An 85-mile (137-kilometer) gas pipeline was constructed from the DDCV to the High Island Offshore System, which is an existing gas transmission system off the Louisiana coast. Also, an oil pipeline was built, which extends 150 miles (241 kilometers) to Freeport, Texas. These two pipelines were one of the longest in the GOM.
Commencing production in 2000, Hoover-Diana's current production averages more than 80,000 bopd and 200 MMcf/d (5.7 MMcm/d). The Hoover-Diana project received OTC's Distinguished Achievement Award for Companies, Organizations and Institutions in 2002.
Satellite Fields
The DDCV also ties satellite fields Madison and Marshall to its facility and were developed by three-well remote subsea developments. Both fields are situated about 7 miles (11 kilometers) from the vessel.
ExxonMobil discovered the Madison field, located in 4,900 feet (1,493 meters) of water, on June 25, 1998. The field is situated on Alaminos Canyon Block 24. The Marshall field, located on East Breaks Blocks 948 and 949 and in 4,300 feet (1,311 meters) of water, was discovered on July 30, 1998.
The fields commenced production in 2002.
|
|
|
|
Hoover
|
|
Producing - 2002 to -
The field commenced production in 2002.
|
|
|
Hoover Deep Draft Caisson Vessel platform (DDCV)
|
|
Producing - May 2000 to -
|
|
|
Madison
|
|
Producing - Feb 2002 to -
Hoover DDCV
|
|
Under Development - Oct 1998 to Jan 2002
The primary production facilities consist of a Deep-Draft Caisson Vessel (DDCV) in 4,800 ft. of water at the Hoover site. Diana, South Diana, Madison, and Marshall production originates several miles away from sub-sea production facilities in over 5000' of water which then flows over to the Hoover DDCV where it is commingled with the Hoover volume.
|
|
Discovery (Drilled) - Jun 1998 to Oct 1998
|
|
Exploratory Drilling - May 1998 to Jun 1998
Discovery drilled on AC24
|
|
|
Marshall
|
|
Producing - 2002 to -
the Marshall and Madison fields, which will be tied into the Hoover hub in 2002.
|
|
Under Development - May 2001 to Dec 2001
|
|
Appraisal Drilling - Mar 2001 to May 2001
According to RigLogix, back to back appraisals were done on EB949 & EB948 using the Pride North America.
|
|
Discovery (Drilled) - Jul 1998 to Mar 2001
|
|
Exploratory Drilling - 1998 to 1998
Drilling Wells A, B, & C on EB948 & EB949.
|
|
|
Diana South
|
|
|
|
|
Discovery (Appraised) - Apr 1997 to Dec 1999
|
|
Appraisal Drilling - Apr 1997 to Apr 1997
|
|
Discovery (Drilled) - Mar 1997 to Apr 1997
AC 65 was temprarily abandoned after its discovery. Plans were to re-enter well No. 1ST01BPoo and sidetrack (02) to the A-50 sand.
|
|
Exploratory Drilling - Feb 1997 to Mar 24, 1997
Discovery Drilled on AC 65 using Transocean's GSF Celtic Sea. Start & End dates are per MMS Master API.
|
|
|
Diana
|
|
Producing - May 2000 to -
|
|
Under Development - Sep 01, 1997 to May 30, 2000
|
|
Discovery (Appraised) - 1997 to Aug 1997
|
|
Appraisal Drilling - 1996 to Jan 1997
2 appraisal wells were drilled. Drillers ran wireline logs and took core samples on 3 exploratory wells, & flow tested No. 3.
|
|
Discovery (Drilled) - Aug 03, 1990 to 1995
A proprietary 3-D survey was shot over the Diana discovery area in 1991 & the No. 1 well was temporarily abandoned.
|
|
|
|
The SubseaIQ Team works everyday to provide you with the latest information on the offshore field development market.
The following table provides you with a detailed record of each addition and update made to this project by the SubseaIQ team.
|
| UPDATE TYPE |
DATE |
DAYS AGO |
| Field Updated |
Dec 05, 2012 |
196 |
|
| Facility Updated |
Dec 05, 2012 |
196 |
|
| Project Description Updated |
Dec 09, 2010 |
923 |
|
| Project Description Updated |
Mar 24, 2010 |
1183 |
|
| Field Updated |
Oct 05, 2009 |
1353 |
|
| Field Updated |
Feb 11, 2009 |
1589 |
|
| Facility Updated |
Jan 05, 2009 |
1626 |
|
| Field Updated |
Jan 05, 2009 |
1626 |
|
| Field Added |
Dec 17, 2008 |
1645 |
|
| Project Description Added |
Dec 17, 2008 |
1645 |
|
| Field Status Added |
Dec 17, 2008 |
1645 |
|
| Field Updated |
Dec 01, 2008 |
1661 |
|
| Field Status Added |
Apr 08, 2008 |
1898 |
|
| Field Status Added |
Mar 06, 2008 |
1931 |
|
| Field Status Added |
Feb 21, 2008 |
1945 |
|
| Field Status Added |
Feb 18, 2008 |
1948 |
|
| Field Status Added |
Feb 08, 2008 |
1958 |
|
| Field Status Added |
Jan 08, 2008 |
1989 |
|
| Field Added |
Jan 08, 2008 |
1989 |
|
| Field Added |
Dec 17, 2007 |
2011 |
|
| Field Status Added |
Dec 17, 2007 |
2011 |
|
| Facility Status Added |
Dec 13, 2007 |
2015 |
|
| Field Status Added |
Dec 13, 2007 |
2015 |
|
| Field Added |
Dec 13, 2007 |
2015 |
|
| Facility Added |
Dec 13, 2007 |
2015 |
|
Project Update History Search - View all the lastest updates made by the SubseaIQ team.
|
|
| Facility Name |
Hoover Deep Draft Caisson Vessel platform (DDCV) |
|
| Duty |
Oil/Gas |
|
| Operator |
ExxonMobil |
|
| Current Status |
Producing since 2000 |
|
| Host Type |
DDCV |
|
| Water Depth |
1,420 m / 4,686 ft |
|
| Dev.Cost |
$1,600,000,000 |
| |
| Region |
US |
| |
| Location |
Alaminos Canyon Blocks 25 and 26 |
| Field Name |
Diana |
|
| Discovery Date |
Aug 1990 |
|
| Block |
East Breaks 945, 946,988, 989 |
|
| Reserve Type |
Oil/Gas |
|
| Current Status |
Producing |
|
| Production Start |
May 2000 |
|
| Water Depth |
1,420 m / 4,686 ft |
| Field Name |
Diana South |
|
| Discovery Date |
Mar 1997 |
|
| Block |
Alaminos Canyon 21, 22, 65, 66 |
|
| Reserve Type |
Oil/Gas |
|
| Current Status |
Producing |
|
| Production Start |
Jan 2000 |
|
| Water Depth |
1,463 m / 4,828 ft |
| Field Name |
Madison |
|
| Discovery Date |
Jun 1998 |
|
| Block |
Alaminos Canyon 24, 25 |
|
| Reserve Type |
Oil/Gas |
|
| Current Status |
Producing |
|
| Production Start |
Feb 2002 |
|
| Water Depth |
1,618 m / 5,339 ft |
| Field Name |
Marshall |
|
| Discovery Date |
Jul 1998 |
|
| Block |
East Breaks 948, 949 |
|
| Reserve Type |
Oil |
|
| Current Status |
Producing |
|
| Production Start |
Jan 2002 |
|
| Water Depth |
1,334 m / 4,402 ft |
| Field Name |
Hoover |
|
| Discovery Date |
|
|
| Block |
Alaminos Canyon 25, 26 |
|
| Reserve Type |
Oil/Gas |
|
| Current Status |
Producing |
|
| Production Start |
Jan 2002 |
|
| Water Depth |
n/a |
|