Offshore Field Development Projects

SubseaIQ provides comprehensive profiles of offshore field developments as well as the latest activiteis surrounding each field. Use this section of SubseaIQ to find all the latest field development activities. You can also stay on top of the latest field activities by subscribing to our free weekly newsletter.

Search Results
Search Results
73 ACTIVITIES FOUND Page 1 of 5
Associated Project: Gazelle

Aug 30, 2012 - Rialto Energy announced that Petroci Holdings, Côte d’Ivoire state-owned oil and gas company, is exercising its option to maximize its interest in the Gazelle Field located offshore in Block CI-202. Petroci will back-in for an additional 11% paying interest making its overall interest 26% (comprising a 16% paying interest). This transaction will reduce Rialto's interest in the field to 74% (84% paying interest). However, its remaining interest in Block CI-202 - outside of the Gazelle Field - remains at 85% (95% paying interest). In the next six months, Petroci Holdings will reimburse Rialto for an 11% share of an estimated $10 million of historical cost that is associated with the Gazelle Field. From the point of the back-in date, Petroci will pay 16% of any future costs. Rialto has a 25-year permit to produce hydrocarbons from Gazelle.

Associated Project: Spanish Point

Aug 29, 2012 - Irish explorer Providence Resources confirmed that site survey operations are about to commence on its Spanish Point acreage in the Main Porcupine Basin off the west coast of Ireland. The work is being carried out by Chrysaor on behalf of the Spanish Point partners and is part of the preparations for the drilling of an appraisal well in 2013. The operations are expected to be finished in early September. Providence, currently the operator of the FEL 2/04 license although it recently agreed to transfer this role to Chrysaor, holds a 32% interest while Chrysaor holds 60%.

Associated Project: Leviathan

Aug 28, 2012 - Noble Mediterranean Energy along with external consulting firms and the Israeli Department of Energy and Water have selected an alternate plan for sealing and abandoning drilling operations in Leviathan 2 offshore Israel. Drilling will be carried out by the ENSCO 5006 (DW semisub) for an estimated period of 60 days at a cost of $46.6 million. However, due to the complexity of the plan, deviations to these estimates are likely. Noble, the field operator, does not expect any environmental damage to result from the abundance of water produced from Leviathan drilling operations.

Associated Project: Falcon

Aug 28, 2012 - TAQA Bratani has announced that exploration drilling operations are underway at Block 211/22a of the UK North Sea. The well is being drilled from the TAQA operated Cormorant North production platform which is located just west of the Contender prospect. The objective of the well is to test Jurassic Brent sandstones at a depth of 16,900 feet. TAQA agreed to cover 100% of the drilling and completion costs of the Contender well and has earned a 60% interest in the block. If it is determined that Contender should be developed, it will be tied into the Cormorant North Platform.

Associated Project: Causeway

Aug 28, 2012 - Antrim Energy has entered into an oil sales contract with BP Oil International. The contract covers Antrim's 35.5% share of oil produced from the Causeway field in UK Block 211/23d. Other partners in the field are Valiant Causeway Limited (54%) and Valiant Gamma Limited (10.5%). Production at Causeway is expected to begin shortly and will be facilitated using the North Cormorant Platform. The contract also allows Antrim to include its share of oil production from the nearby Fionn field once production is brought online, which is expected in mid-2013.

Associated Project: La Bella

Aug 28, 2012 - Based on "strong industry interest", WHL is planning to speed up its 3D seismic acquisition program in Exploration Permit VIC/P67 by 12 months. The undeveloped La Bella gas field is located in the Permit and contains an estimated 150 billion cubic feet of contingent resources. Currently, WHL is looking for partners to participate in the data acquisition program which it expects to start in 2Q 2013. The program involves purchasing and assessing 313 square miles of 3D seismic data and is subject to regulatory environmental approvals.

Associated Project: Johan Sverdrup

Aug 27, 2012 - Lundin Petroleum's fifth Johan Sverdrup appraisal well has reached a final depth of 6,758 feet at Production License (PL) 501. Well 16/2-13S was drilled by the Transocean Arctic (mid-water semisub) in 380 feet of water. An 82-foot gross oil column was encountered in Upper and Middle Jurassic sandstone. Coring and logging operations were carried out and confirmed excellent reservoir quality. The well will now be sidetracked in an effort to investigate: the depth to top reservoir, lateral thickness and properties of the Jurassic reservoir and to establish an oil water contact.

Associated Project: Draugen

Aug 27, 2012 - A/S Norske Shell has awarded a $100 million contract to Framo Engineering to supply its Draugen field with a complete subsea, multiphase booster pump system which includes topside power and control, power and control umbilical and the complete subsea pump module and manifold. Framo, a Schlumberger company, will install the system in Norwegian waters at a depth of 8,202 feet (250 meters). The system is designed to facilitate increased oil production in the Draugen field and will be installed in the summer of 2014.

Associated Project: North El Burg

Aug 27, 2012 - BP Egypt announced the discovery of gas in both the Taurt North and Seth South fields in the North El Burg offshore concession, Nile Delta. Satis-1 and Satis-3 Oligocene deep and Salmon-1 shallow Pleistocene were previous discoveries made by BP in this same concession. The stakeholders in the North El Burg Offshore Concession are the operator BP and its partner IEOC, each holding a 50% interest.

BP Egypt announced the discovery of gas in both the Taurt North and Seth South fields in the North El Burg offshore concession, Nile Delta. Satis-1 and Satis-3 Oligocene deep and Salmon-1 shallow Pleistocene were previous discoveries made by BP in this same concession. The stakeholders in the North El Burg Offshore Concession are the operator BP and its partner IEOC, each holding a 50% interest. The Scarabeo 4 (mid-water semisub) drilled both the Taurt North for Seth South wells for IEOC on behalf of the concession operator BP in water depths of 361 feet (110 meters) and 256 feet (78 meters), respectively. Presence of gas was confirmed by wireline logs, pressure data and fluid samples in one Pleistocene interval in Taurt North and in two Plio-Pleistocene intervals in Seth South. Studies are being conducted to determine options for tying both discoveries to a nearby existing infrastructure.

Associated Project: Geitungen

Aug 27, 2012 - Statoil has made a discovery in the North Sea's Utsira High within the Geitungen prospect. Well 16/2-12 intercepted a 115 foot (35 meter) oil column within a high-quality, Jurassic reservoir. Estimated volumes are between 140 and 270 million barrels of recoverable oil equivalents. Basement rock was also found to hold oil. Well 16/2-12, the eighth well in PL265, was drilled by the Ocean Vanguard (mid-water semisub) to a vertical depth of 6,709 feet (2,045 meters).

Geitungen has been defined as its own prospect in the PL265. Although it was drilled 1.86 miles (3 kilometers) north of the Johan Sverdrup discovery, well data indicates communication between the two discoveries is likely.

Statoil is the operator of PL265 and holds a 40% interest in the license. Its partners include Petoro AS with 30%, Det norske oljeselskap ASA with 20% and Lundin Norway AS holding the balance of the license with 10%.

Associated Project: Greater Gullfaks Area

Aug 23, 2012 - Statoil, along with its partner Petoro, has announced plans for further development of the Gullfaks South field located on the Norwegian continental shelf. Production in the field has fallen sharply in recent years. With a planned investment of $1.4 billion, Statoil will apply its "fast-track" concept which will make use of existing infrastructure as well as two new subsea structures and six additional development wells. The partners believe that their investment will allow recovery in the field to be increased by 65 million barrels of oil equivalent.

Associated Project: Anoa

Aug 23, 2012 - Premier Oil reported that the Anoa facility has been undergoing a series of upgrades via engineering projects collectively known as Phase 4. The first phase commenced began in July with pre-fabricated compression models being installed on the platform. The second phase of construction will continue during Summer 2013. The overall project will be completed during the second half of 2013 and will result in the development of around 200 billion cubic feet of undeveloped proven reserves on Natuna Sea Block A and increase the Anoa facility's capacity to 200 BBtud.

Associated Project: Causeway

Aug 23, 2012 - UK's Department of Energy and Climate Change has approved the Field Development Plan for the Fionn Field. Previously drilled and suspended, 211/22a-6, will be completed with dual electrical submersible pumps. First oil is anticipated in mid-2013 at an initial rate of 4,500 bopd. The well, which was originally drilled in 2007, tested oil from the Ness and Etive formations at a combined flow rate of approximately 5,500 bopd. Production from Fionn will be combined with production from Causeway and transported for processing to the Cormorant North platform.

Associated Project: Darwin

Aug 23, 2012 - Borders & Southern received positive results from the fluid analysis performed on samples from Well 61/17-1 located offshore the Falkland Islands. The initial condensate yield from the Darwin gas samples, as measured in a laboratory separator test, varies from 123 to 140 stb/MMscf. The API gravity of the condensate is 46 to 49 degrees. Based on the condensate yield and ongoing reservoir modeling, the Company estimates the recoverable volume of condensate to be 130 to 250 million barrels with a mid-case of 190 million barrels. The company will now move forward with the acquisition of additional 3D seismic data in 2013 and explore the best way to fund an exploration and appraisal campaign.

Associated Project: Bualuang

Aug 23, 2012 - Construction on the Bualuang Bravo Platform is scheduled to be finished by the end of August and approvals have been received for the environmental impact assessment. The K1 HLV will begin load-out and installation of the platform by mid-October and by the end of October the platform will be ready for development drilling activities.

  Page 1 of 5

 
Recent Activities By Region
Africa - Other
Operator Update 3 activities
Africa - West
Acreage Acquisition 2 activities
Drilling Operations 1 activity
New Discovery 2 activities
Operator Update 2 activities
Asia - SouthEast
Appraisal Operations 3 activities
Contract Award 1 activity
Development Activity 2 activities
Drilling Operations 1 activity
Operator Update 3 activities
Production Start 1 activity
Australia
Development Activity 1 activity
Drilling Operations 2 activities
New Discovery 1 activity
Operator Update 2 activities
Production Start 1 activity
Europe - East
Drilling Operations 1 activity
Europe - North Sea
Acreage Acquisition 3 activities
Appraisal Operations 2 activities
Contract Award 3 activities
Development Activity 5 activities
Drilling Operations 3 activities
Operator Update 5 activities
Production Start 2 activities
Mediterranean
New Discovery 1 activity
Operator Update 2 activities
N. America - Canadian Atlantic
Contract Award 1 activity
N. America - Mexico
New Discovery 1 activity
N. America - US Alaska
Operator Update 1 activity
N. America - US GOM
Development Activity 4 activities
New Discovery 1 activity
Operator Update 3 activities
S. America - Brazil
Acreage Acquisition 2 activities
Drilling Operations 1 activity
New Discovery 1 activity
Operator Update 1 activity
S. America - Other & Carib.
Drilling Operations 1 activity
Operator Update 1 activity
Projects with Recent Activities
Carla Africa - West
Carlsberg Europe - North Sea
Gina Krog (Dagny) Europe - North Sea FSO/FSU
Hagar Qim Mediterranean
Karish Mediterranean
Matuku Australia
Wingat Africa - West
Activities By Month
May  2013 60 activities
April  2013 75 activities
March  2013 76 activities
February  2013 66 activities
January  2013 55 activities
December  2012 43 activities
November  2012 17 activities