| Operator: | Talisman |
| Water Depth: | 138 m / 455 ft |
| Region: | Europe - North Sea |
| Country: | UK |
| Last Updated: | Sep 14, 2012 (view update history) |
|
The Tartan field is located in Blocks 15/16a and 14/20a of the UK sector of the North Sea in 453 feet (138 meters) of water. Talisman Energy wholly owns and operates the field.
Field Development
The field was developed by five production and two wells connecting to a four-legged steel jacket supporting process, utilities drilling and accommodation modules via a module support frame. The jacket is fixed to the seabed by an array of 28 piles, which was installed in 1979.
First production from the field was achieved in January 1981.
Satellite Fields
Several fields are subsea tied-back to the Tartan platform. The Highlander field was developed as a subsea tie-back to the platform in 1985 followed by ...
The Tartan field is located in Blocks 15/16a and 14/20a of the UK sector of the North Sea in 453 feet (138 meters) of water. Talisman Energy wholly owns and operates the field.
Field Development
The field was developed by five production and two wells connecting to a four-legged steel jacket supporting process, utilities drilling and accommodation modules via a module support frame. The jacket is fixed to the seabed by an array of 28 piles, which was installed in 1979.
First production from the field was achieved in January 1981.
Satellite Fields
Several fields are subsea tied-back to the Tartan platform. The Highlander field was developed as a subsea tie-back to the platform in 1985 followed by the Petronella field in 1986 (Block 14/20bF-1).
Oil and gas from the Galley field were tied into Tartan in 1998 and then reconfigured as a full subsea tie-back in 2007. The Duart field was developed as a subsea tie-back, also in 2007, while Tartan North Terrace was subsea tied-back to the platform in 2004.
|
|
|
Duart Remains Shut-In
Type: Status Update
Sep. 2012 - The Duart field was shut in on 26 July due to a process shutdown on the host Tartan platform and remains shut-in. Bridge received notification from the operator of the Duart field that, while they are working to find solutions to accelerate the availability of the Tartan platform, Duart production is expected to restart in October 2013. Bridge holds a 50% working interest in the Duart field. Bridge will not be exposed to operating costs whilst Duart production is shut-in.
|
|
|
|
Duart Field Remains Shut-In
Type: Status Update
Aug. 2012 - Talisman Energy stated that the Duart field, which was shut-in on July 26 due to a process shutdown on the host Tartan platform, remains shut-in to date. During the shut-in period, additional technical issues have come to light which are preventing the restart of gas processing on the Tartan platform. The gas process is required to support Duart production. The operator will continue to close the field until these problems are resolved. Talisman indicates that the earliest restart date is December 2012.
|
|
|
|
Duart Resumes Production
Type: Production Start
Apr. 2012 - Bridge Energy has restarted production at the Duart field, which has been shut-in since Oct. 5, 2011 as a result of planned maintenance activity on the host Tartan platform. The extended shutdown on the Tartan platform has enabled completion of a more comprehensive maintenance work scope which should increase the near term uptime of the facility.
|
|
|
|
Operations at North Sea Tartan Platform to Restart Soon
Type: Status Update
Mar. 2012 - Bridge Energy reported that the Tartan and Duart field operator, Talisman, is working to restart operations on the Tartan platform and projects production to restart at the end of March. The extended shutdown on Tartan has enabled completion of a comprehensive work scope which should increase the near term uptime of the facility, said Bridge. The increased host uptime and a period of flush production following the long shut down is expected to partly offset the delayed production volumes.
|
|
|
|
Duart Field Shut-In
Type: Status Update
Jan. 2012 - Bridge Energy stated that the Duart field is currently shut-in with production expected to restart in mid-March. The satellite field is located on UK Block 14/20 in the North Sea about 116 miles (186 kilometers) northeast of Aberdeen, Scotland.
|
|
|
|
Duart Field Shut Down for Platform Maintenance
Type: Development Activity
Oct. 2011 - Bridge Energy reported the planned maintenance shutdown commenced on the Tartan platform, which is the Duart field host platform. The field operator, Talisman, is also performing safety-related upgrades at Tartan. Production re-start is expected in mid-March 2012. The daily production from the Duart field prior to the shutdown was around 1500 bbl/d (gross) of oil at 75% watercut.
|
|
|
Tartan North Terrace
|
|
|
|
|
|
Galley
|
|
|
|
|
|
Duart
|
|
Suspended - Jul 26, 2012 to -
|
|
Producing - Sep 24, 2007 to Jul 25, 2012
Located in UK Block 14/20, developed in 2007 with a single subsea development well tied back to the nearby Talisman operated Tartan platform.
|
|
Discovery (Drilled) - 1988 to 1999
Talisman said Friday initial production rates are expected to surpass 6,000 barrels of oil a day from the field, discovered in 1988 and located 186 kilometres northeast of Aberdeen, Scotland.
|
|
|
Petronella
|
|
|
|
|
|
Highlander
|
|
|
|
|
|
Tartan Platform
|
|
Suspended - Jul 26, 2012 to -
|
|
|
Tartan
|
|
|
|
|
|
Tartan Platform
|
|
Producing - 1981 to Jul 25, 2012
|
|
|
|
The SubseaIQ Team works everyday to provide you with the latest information on the offshore field development market.
The following table provides you with a detailed record of each addition and update made to this project by the SubseaIQ team.
|
| UPDATE TYPE |
DATE |
DAYS AGO |
| Field Updated |
Jan 10, 2013 |
160 |
|
| Field Updated |
Sep 14, 2012 |
278 |
|
| Activity Added |
Sep 14, 2012 |
278 |
|
| Activity Added |
Aug 17, 2012 |
306 |
|
| Field Updated |
Aug 17, 2012 |
306 |
|
| Field Status Updated |
Aug 17, 2012 |
306 |
|
| Field Status Added |
Aug 17, 2012 |
306 |
|
| Facility Status Updated |
Aug 17, 2012 |
306 |
|
| Facility Status Added |
Aug 17, 2012 |
306 |
|
| Field Updated |
Apr 11, 2012 |
434 |
|
| Facility Updated |
Apr 11, 2012 |
434 |
|
| Activity Added |
Apr 11, 2012 |
434 |
|
| Project Description Added |
Apr 02, 2012 |
443 |
|
| Field Updated |
Apr 02, 2012 |
443 |
|
| Field Added |
Apr 02, 2012 |
443 |
|
| Field Status Added |
Apr 02, 2012 |
443 |
|
| Field Updated |
Mar 29, 2012 |
447 |
|
| Facility Updated |
Mar 29, 2012 |
447 |
|
| Activity Added |
Mar 29, 2012 |
447 |
|
| Field Updated |
Feb 16, 2012 |
489 |
|
| Field Status Updated |
Jan 26, 2012 |
510 |
|
| Activity Added |
Jan 26, 2012 |
510 |
|
| Field Updated |
Jan 26, 2012 |
510 |
|
| Field Added |
Jan 05, 2012 |
531 |
|
| Field Updated |
Jan 05, 2012 |
531 |
|
| Field Status Updated |
Jan 05, 2012 |
531 |
|
| Field Status Added |
Jan 05, 2012 |
531 |
|
| Facility Added |
Jan 05, 2012 |
531 |
|
| Facility Status Added |
Jan 05, 2012 |
531 |
|
| Facility Updated |
Jan 05, 2012 |
531 |
|
| Activity Added |
Oct 03, 2011 |
625 |
|
Project Update History Search - View all the lastest updates made by the SubseaIQ team.
|
|
| Facility Name |
Tartan Platform |
|
| Duty |
Oil/Gas |
|
| Operator |
Talisman |
|
| Current Status |
Suspended since 2012 |
|
| Host Type |
Fixed Platform |
|
| Water Depth |
138 m / 455 ft |
|
| Dev.Cost |
n/a |
| |
| Region |
UK |
| |
| Location |
15/16 |
| Field Name |
Duart |
|
| Discovery Date |
Jan 1988 |
|
| Block |
14/20b |
|
| Reserve Type |
Gas |
|
| Current Status |
Suspended |
|
| Production Start |
Sep 2007 |
|
| Water Depth |
n/a |
| Field Name |
Tartan |
|
| Discovery Date |
|
|
| Block |
15/16a, 14/20a |
|
| Reserve Type |
n/a |
|
| Current Status |
Producing |
|
| Production Start |
Jan 1981 |
|
| Water Depth |
138 m / 455 ft |
| Field Name |
Galley |
|
| Discovery Date |
|
|
| Block |
|
|
| Reserve Type |
n/a |
|
| Current Status |
Producing |
|
| Production Start |
Jan 1998 |
|
| Water Depth |
n/a |
| Field Name |
Highlander |
|
| Discovery Date |
|
|
| Block |
14/20bF-1 |
|
| Reserve Type |
n/a |
|
| Current Status |
Producing |
|
| Production Start |
Jan 1985 |
|
| Water Depth |
n/a |
| Field Name |
Petronella |
|
| Discovery Date |
|
|
| Block |
14/20 |
|
| Reserve Type |
n/a |
|
| Current Status |
Producing |
|
| Production Start |
Jan 1986 |
|
| Water Depth |
138 m / 455 ft |
| Field Name |
Tartan North Terrace |
|
| Discovery Date |
|
|
| Block |
|
|
| Reserve Type |
n/a |
|
| Current Status |
Producing |
|
| Production Start |
Jan 2004 |
|
| Water Depth |
n/a |
|