| Triton FPSO |
 |
| Operator: | Dana Petroleum |
| Water Depth: | 91 m / 300 ft |
| Region: | Europe - North Sea |
| Country: | UK |
| Last Updated: | Oct 2, 2012 (view update history) |
|
The Triton FPSO is located on Block 21/30 in the UK sector of the North Sea, about 190 kilometers east of Aberdeen in 295 feet (90 meters) of water. Hess will relinquish operatorship of the Triton FPSO and Dana will serve as the operator.
Triton serves as a central hub for several small, subsea fields developed in the area, including the Guillemot and Bittern fields. All fields are controlled remotely from Triton.
FPSO Details
Moored on the field in 2000 with a design life of 21 years, the vessel measures 800 feet long with a dead weight of 105,000 tons. The FPSO can store 630,000 barrels of oil and will process 105,000 barrels/day of crude oil, using three stages of separation, with a dehydrator and a test separator for ...
The Triton FPSO is located on Block 21/30 in the UK sector of the North Sea, about 190 kilometers east of Aberdeen in 295 feet (90 meters) of water. Hess will relinquish operatorship of the Triton FPSO and Dana will serve as the operator.
Triton serves as a central hub for several small, subsea fields developed in the area, including the Guillemot and Bittern fields. All fields are controlled remotely from Triton.
FPSO Details
Moored on the field in 2000 with a design life of 21 years, the vessel measures 800 feet long with a dead weight of 105,000 tons. The FPSO can store 630,000 barrels of oil and will process 105,000 barrels/day of crude oil, using three stages of separation, with a dehydrator and a test separator for well testing.
Wellstream from the surrounding area enters the FPSO via nine flexible risers and two umbilicals. The Triton FPSO provides primary separation facilities through two dedicated trains (one for the Bittern area and one for the Guillemot West area) for the separation of oil, gas and water. Following primary separation and metering, the fluids are commingled and then are subject to secondary separation, oil processing, gas processing and compression through shared facilities.
Produced water handling is provided through two new water treatment trains, one for Bittern and one for Guillemot West. The gas is processed and two gas compressors provide gas for fuel, gas lift and gas export. Water injection services are also provided.
Oil is exported via shuttle tankers; gas is used for fuel on the Triton FPSO and gas lift, with excess volumes exported via a spur line tied into the SEGAL line for transport to St. Fergus.
The average daily production is 60,000 bopd and 70 MMcm/d for Bittern; 28,000 bopd and 50 MMcm/d for Guillemot West; and 4,000 bopd and 10 MMcm/d for Guillemot Northwest.
Guillemot
The Guillemot area consists of the Guillemot West, Guillemot North West, Clapham, Pict and Saxon fields. Dana serves as the operator of the fields in the Guillemot West area.
Guillemot commenced production on April 20, 2000.
Bittern
The Bittern field was developed by six subsea wells, four producers and two water injectors. The wells are tied into two seven-slot manifolds and tied back to the FPSO by two, 10-inch production lines and an 8-inch production/test line.
Production commenced from Bittern in October 2004.
|
|
|
Dana Adds to Stake in Bittern
Type: Operator Update
Oct. 2012 - Dana Petroleum recently announced it has taken over operatorship of the Triton FPSO from Hess. The Triton FPSO serves the Bittern, Guillemot West and Northwest, Clapham, Pict and Saxon fields. As part of the agreement, Dana also acquired Hess' 28.28% stake in the Bittern field bringing Dana's interest in the field to 33%. The acquisition is keeping in line with the company's strategy of moving from mainly non-operated to fully operated activities in the UK North Sea.
|
|
|
|
Wood Group Reappointed as Prime Contractor for Triton FPSO
Type: Status Update
Nov. 2010 - Hess Limited and partners reappointed Wood Group for three years as the prime contractor to provide operations and maintenance services to the Triton FPSO. The contract also has three further one-year extension options, and is worth about US $81 million per year. The Triton FPSO is located on Block 21/30, about 118 miles (190 kilometers) east of Aberdeen, United Kingdom. Triton has been in this location since 2000 and has a design life of 21 years.
|
|
|
|
Shell Selects Cameron's MARS Tech for First North Sea Application
Type: Subsea Equipment
Jun. 2008 - Shell UK has successfully installed the first of three subsea MARS (Multiple Application Re-injection System) interfaces on its Bittern field in the North Sea. The system has been described as a "USB port for wellheads" and is being adopted by Shell as part of their extended oil recovery (EOR) strategy for the region.
|
|
|
|
Endeavour Completes Talisman Expro Acquisition
Type: Acreage Acquisition
Nov. 2006 - Endeavour Energy UK has completed its acquisition of Talisman Expro's interest in eight fields in the Central North Sea including a 2.42% in the Bittern field.
|
|
|
|
Subsea Company over the Moon with Sales of MARS
Type: Subsea Equipment
Aug. 2006 - DES Operations has entered into an agreement with oil giant Shell for the sale of three of its revolutionary subsea technology systems. Known as MARS (Multiple Application Re-injection System), the systems are destined for Shell's Bittern Field in the North Sea where they will be used to upgrade the subsea Xmas tree and maximize oil production.
|
|
|
|
Endeavour Agrees to Acquire UK Producing Assets
Type: Acreage Acquisition
May. 2006 - Endeavour Energy UK has entered into an agreement with Talisman Expro to acquire four producing assets in the Central North Sea including 2.422% of the Bittern field.
|
|
|
|
CETCO Successfully Treats Contaminated Water on Triton FPSO
Type: Status Update
Apr. 2006 - CETCO Oilfield Services has successfully treated contaminated water returns on the Amerada Hess Triton FPSO. The fluids were treated during well clean-up operations and have reduced the potential for overboard oil discharges and production upsets at the offshore installation approximately 120miles east of Aberdeen. In total three wells at the Bittern field were treated using a combination of scale squeezes and acid stimulation.
|
|
|
|
Petro-Canada's Pict Devleopment Achieves First Oil
Type: Production Start
Jun. 2005 - Petro-Canada's Pict development, located in block 21/23b in the UK Central North Sea, achieved first oil on June 19, 2005. The Pict field, 100% owned and operated by Petro-Canada, is estimated to have resources of about 15 million barrels of oil.
|
|
|
|
Petro-Canada Moves Ahead with Pict Development Plans
Type: Development Activity
Apr. 2004 - Petro-Canada is going forward with its £50 million development plan for the Pict field in the North Sea. Applications have been submitted to the UK Government for approval to develop the field. The Pict field, formerly known as Grebe, is located approximately 110 miles east of Aberdeen. Petro-Canada acquired the field as a part of an asset package from Shell and ExxonMobil.
|
|
|
|
Petro-Canada Begins Production from Clapham in the North Sea
Type: Production Start
Dec. 2003 - The Clapham development, located in block 21/24 in the UK Central North Sea, achieved first oil in late November 2003.
|
|
|
|
Petro-Canada Gets Green Light for Clapham Development
Type: Development Activity
Jan. 2003 - The Department of Trade and Industry has granted approval of the Field Development Plan for the Clapham field, located in block 21/24 in the Central North Sea. The field will be brought into production using sub-sea facilities tied back to the Triton floating production storage and offloading vessel (FPSO) via the Guillemot West & Northwest subsea infrastructure.
|
|
|
|
Shell Awards Coflexip Stena Two North Sea Contracts
Type: Contract Award
Jul. 2002 - Coflexip Stena Offshore has been awarded two contracts by Shell Expro worth nearly £12million for work o the Penguis and Guillemot developments in the UK sector of the North Sea.
|
|
|
|
Petro-Canada Extends North Sea Fields
Type: Status Update
Jul. 2002 - Petro-Canada has completed an extension project that will add approximately 18,000 barrels a day of crude oil production to two North Sea oil fields. The company invested GBP 50 million in the Western Extension project which was completed on schedule and under budget. The project raises crude output from the Guillemot West and Northwest oil fields to over 28,000 barrels per day.
|
|
|
|
Kvaerner Awarded Guillemont West Supply Contract
Type: Subsea Equipment
Mar. 2002 - Kvaerner Oilfield Products has been awarded a contract to supply the DUET multiphase flow meter for subsea service by Veba Oil & Gas UK Limited. This will be used in the Guillemot West - Western Extension Project - in the UK sector of the North Sea.
|
|
|
|
Petro-Canada Acquires Veba Assets
Type: Acreage Acquisition
Jan. 2002 - Petro-Canada announced that it has agreed to acquire the international oil and gas operations of Veba Oil & Gas Gmbh from Veba and BP p.l.c. for a price of Cdn $3.2 billion in cash.
|
|
|
Saxon
|
|
Producing - Sep 2007 to -
|
|
Under Development - 2007 to Aug 2007
Saxon will tie back to the Triton FPSO.
|
|
Discovery (Drilled) - Jan 30, 2005 to Dec 2006
Well 21/23b- 7 abandoned.
|
|
Exploratory Drilling - Dec 01, 2004 to Jan 29, 2005
Exploratory well 21/23b- 7
|
|
|
Triton FPSO
|
|
Producing - Apr 2000 to -
|
|
|
Clapham
|
|
Producing - Nov 2003 to -
|
|
Under Development - Jan 2003 to Nov 2003
Clapham will be developed as a subsea tie-back to the Triton FPSO via the Guillemot West & North West subsea infrastructure.
|
|
Discovery (Drilled) - Aug 07, 1999 to Jan 2003
Well 21/24- 6 abandoned.
|
|
Exploratory Drilling - Jul 14, 1999 to Aug 06, 1999
Exploratory well 21/24- 6
|
|
|
Bittern
|
|
Producing - Oct 2004 to -
|
|
Under Development - Mar 1998 to Mar 2000
Developed as a subsea tie-bak to the Triton FPSO.
|
|
Discovery (Drilled) - Jul 15, 1996 to Feb 1998
Well 29/01b- 5 suspended.
|
|
Exploratory Drilling - May 14, 1996 to Jul 14, 1996
Exploratory well 29/01b- 5
|
|
|
Guillemot North West
|
|
Producing - Apr 2000 to -
|
|
Under Development - Mar 1998 to Mar 2000
|
|
Discovery (Drilled) - Aug 30, 1985 to Feb 1998
Well 21/24- 3 suspended.
|
|
Exploratory Drilling - Jul 19, 1985 to Aug 29, 1985
Exploration well 21/24- 3
|
|
|
Guillemot West
|
|
Producing - Jul 2000 to -
|
|
Under Development - Mar 1998 to Jun 2000
|
|
Discovery (Drilled) - Feb 10, 1983 to Feb 1998
Well 21/25- 3 abandoned.
|
|
Exploratory Drilling - Sep 28, 1982 to Feb 09, 1983
Exploration well 21/25- 3
|
|
|
Pict
|
|
Producing - Jun 19, 2005 to -
The Pict field is estimated to have resources of about 15 million barrels of oil.
|
|
Under Development - Apr 2004 to Jun 2005
Pict will be developed as a subsea tie-back to the Triton FPSO.
|
|
Discovery (Drilled) - Jan 04, 1982 to Apr 2004
|
|
Exploratory Drilling - Oct 18, 1981 to Jan 03, 1982
Exploration well 21/23b- 1
|
|
|
|
The SubseaIQ Team works everyday to provide you with the latest information on the offshore field development market.
The following table provides you with a detailed record of each addition and update made to this project by the SubseaIQ team.
|
| UPDATE TYPE |
DATE |
DAYS AGO |
| Facility Updated |
Oct 02, 2012 |
235 |
|
| Field Updated |
Oct 02, 2012 |
235 |
|
| Activity Added |
Oct 02, 2012 |
235 |
|
| Field Updated |
Mar 05, 2012 |
446 |
|
| Facility Updated |
Mar 05, 2012 |
446 |
|
| Project Description Updated |
Mar 05, 2012 |
446 |
|
| Field Updated |
Feb 24, 2012 |
456 |
|
| Facility Updated |
Jan 16, 2012 |
495 |
|
| Field Status Updated |
Jan 16, 2012 |
495 |
|
| Project Description Added |
Jan 16, 2012 |
495 |
|
| Field Updated |
Jan 16, 2012 |
495 |
|
| Field Updated |
Nov 02, 2011 |
570 |
|
| Facility Updated |
Nov 02, 2011 |
570 |
|
| Facility Updated |
Nov 04, 2010 |
933 |
|
| Activity Added |
Nov 04, 2010 |
933 |
|
| Field Updated |
Apr 21, 2009 |
1495 |
|
| Facility Updated |
Apr 21, 2009 |
1495 |
|
| Facility Status Added |
Jan 06, 2009 |
1600 |
|
| Field Status Added |
Jan 06, 2009 |
1600 |
|
| Facility Added |
Jan 06, 2009 |
1600 |
|
| Field Added |
Jan 06, 2009 |
1600 |
|
| Activity Added |
Jun 25, 2008 |
1795 |
|
| Activity Added |
Nov 01, 2006 |
2397 |
|
| Activity Added |
Aug 24, 2006 |
2466 |
|
| Activity Added |
May 26, 2006 |
2556 |
|
| Activity Added |
Apr 27, 2006 |
2585 |
|
| Activity Added |
Jun 23, 2005 |
2893 |
|
| Activity Added |
Apr 15, 2004 |
3327 |
|
| Activity Added |
Dec 18, 2003 |
3446 |
|
| Activity Added |
Jan 06, 2003 |
3792 |
|
| Activity Added |
Jul 17, 2002 |
3965 |
|
| Activity Added |
Jul 03, 2002 |
3979 |
|
| Activity Added |
Mar 01, 2002 |
4103 |
|
| Activity Added |
Jan 29, 2002 |
4134 |
|
Project Update History Search - View all the lastest updates made by the SubseaIQ team.
|
|
| Facility Name |
Triton FPSO |
|
| Duty |
Oil/Gas |
|
| Operator |
Dana Petroleum |
|
| Current Status |
Producing since 2000 |
|
| Host Type |
FPSO |
|
| Water Depth |
91 m / 300 ft |
|
| Dev.Cost |
n/a |
| |
| Region |
UK |
| |
| Location |
21/30 |
| Field Name |
Bittern |
|
| Discovery Date |
Jul 1996 |
|
| Block |
29/01 29/01b- 5 |
|
| Reserve Type |
Gas |
|
| Current Status |
Producing |
|
| Production Start |
Oct 2004 |
|
| Water Depth |
119 m / 393 ft |
| Field Name |
Guillemot North West |
|
| Discovery Date |
Aug 1985 |
|
| Block |
21/24, 21/29a, P.021 |
|
| Reserve Type |
Oil |
|
| Current Status |
Producing |
|
| Production Start |
Apr 2000 |
|
| Water Depth |
87 m / 287 ft |
| Field Name |
Guillemot West |
|
| Discovery Date |
Feb 1983 |
|
| Block |
21/25 |
|
| Reserve Type |
Oil |
|
| Current Status |
Producing |
|
| Production Start |
Jul 2000 |
|
| Water Depth |
88 m / 290 ft |
| Field Name |
Pict |
|
| Discovery Date |
Jan 1982 |
|
| Block |
21/23 |
|
| Reserve Type |
Oil |
|
| Current Status |
Producing |
|
| Production Start |
Jun 2005 |
|
| Water Depth |
84 m / 277 ft |
| Field Name |
Saxon |
|
| Discovery Date |
Jan 2005 |
|
| Block |
21/23 |
|
| Reserve Type |
Oil |
|
| Current Status |
Producing |
|
| Production Start |
Sep 2007 |
|
| Water Depth |
86 m / 284 ft |
| Field Name |
Clapham |
|
| Discovery Date |
Aug 1999 |
|
| Block |
21/24 |
|
| Reserve Type |
Oil |
|
| Current Status |
Producing |
|
| Production Start |
Nov 2003 |
|
| Water Depth |
85 m / 281 ft |
|