Offshore Field Development Projects
Juliet
Operator:Perenco
Water Depth:21 m / 69 ft
Region:Europe - North Sea
Country:UK
Last Updated:Jan 9, 2013    (view update history)
Project Description
The Juliet field is located in the Southern Basin sector of the United Kingdom Continental Shelf, about 25 miles (40 kilometers) east of the Humber Estuary. Situated on Block 47/14b in 203 feet (62 meters) of water, the gas field is operated by GDF Suez, holding a 51.56% interest. Hansa holds 19%, while First Oil holds the remaining 29.44% interest.

The well was drilled by the Noble Piet van Eide jackup to a total depth of 9,502 feet (2,896 meters) in 2008. A production test was performed on the 47/14b-10 well, and it flowed at a rate of up to 38 MMcf/d. Juliet was deemed commercially successful shortly later.

Field Development

on July 13, 2012, GDF Suez and partners sanctioned the Juliet gas field. First gas from Juliet is expected in 4Q ...
The Juliet field is located in the Southern Basin sector of the United Kingdom Continental Shelf, about 25 miles (40 kilometers) east of the Humber Estuary. Situated on Block 47/14b in 203 feet (62 meters) of water, the gas field is operated by GDF Suez, holding a 51.56% interest. Hansa holds 19%, while First Oil holds the remaining 29.44% interest.

The well was drilled by the Noble Piet van Eide jackup to a total depth of 9,502 feet (2,896 meters) in 2008. A production test was performed on the 47/14b-10 well, and it flowed at a rate of up to 38 MMcf/d. Juliet was deemed commercially successful shortly later.

Field Development

on July 13, 2012, GDF Suez and partners sanctioned the Juliet gas field. First gas from Juliet is expected in 4Q 2013 with peak production from the field anticipated to be 80 MMcf/d.

The development will compromise two horizontal subsea wells tied-back some 14 miles (22 kilometers) to the Penrenco-operated Pickerill A platform via a 12-inch diameter pipeline and control umbilical.

The operator will drill the first development well in 2Q 2013 with topsides and subsea construction taking place throughout 2013.

Existing infrastructure will transport Juliet gas to the ConocoPhillips operated Theddlethorpe terminal on the Lincolnshire coast.
Activities
Status Updates
Technip Grabs Juliet Deal
Type: Development Activity

Jan. 2013 - GDF Suez awarded an engineering, procurement, installation and construction (EPIC) contract to Technip concerning the development of the Juliet field in UK Block 47/14b. Technip will supply and install a 14-mile 12-inch rigid flowline, 14-mile static control umbilical, 12-inch riser, 16-inch J-tube assembly and a 100-ton manifold. The equipment will be tied-back to the Pickerill A platform. Offshore construction should be complete by the end of 2013.

GDF Suez Sanctions Juliet Development
Type: Development Activity

Jul. 2012 - GDF Suez has sanctioned the Juliet gas field at Block 47/14b in the UK sector of the North Sea. First gas from Juliet is expected in 4Q 2013 with peak production from the field anticipated to be 80 MMcf/d. The development will compromise two horizontal subsea wells tied-back some 14 miles (22 kilometers) to the Penrenco-operated Pickerill A platform via a 12-inch diameter pipeline and control umbilical. The operator will drill the first well in 2Q 2013 with topsides and subsea construction taking place throughout 2013. Existing infrastructure will transport Juliet gas to the ConocoPhillips operated Theddlethorpe terminal on the Lincolnshire coast.

Xodus Group to Perform FEED Study for Juliet
Type: Contract Award

Aug. 2010 - Xodus Group won a front-end engineering and design study from GDF Suez for the Juliet field. The contract includes flow assurance, and operational, safety and environmental risk assessment to tie-back Juliet to the Amethyst platform. The company will also provide materials assessment and procurement support. The Juliet field is located in the Southern Basin sector of the United Kingdom Continental Shelf, about 25 miles (40 kilometers) east of the Humber Estuary. Situated on Block 47/14b in 203 feet (62 meters) of water, the gas field is operated by GDF Suez, holding a 51.56% interest. First Oil holds the remaining 48.44% interest.

GDF Suez Strikes Gas at Juliet Well in Southern North Sea
Type: New Discovery

Jan. 2009 - GDF SUEZ announced a new gas discovery with the 47/14b-10 "Juliet" well in UK's Southern North Sea. The Noble Piet van Eide drilled the well to a total depth of 9,502 feet, and flowed at rates of up to 38 million standard cubic feet per day. Plans for Juliet is to evaluate the development options during the first half of 2009 with the possibility of first gas in late 2010 or early 2011.

Juliet
Discovery (Drilled) - Jan 2009 to -

Well 47/14b-10 flowed at rates of up to 38 million standard cubic feet per day. Plans for Juliet is to evaluate the development options during the first half of 2009 with the possibility of first gas in late 2010 or early 2011

Exploratory Drilling - Oct 2008 to Dec 2008

The Noble Piet Van Ede drilled well 47/14b-10.

Pickerill Platform
Producing - Aug 1992 to -

Update History
The SubseaIQ Team works everyday to provide you with the latest information on the offshore field development market. The following table provides you with a detailed record of each addition and update made to this project by the SubseaIQ team.
UPDATE TYPE DATE DAYS AGO
Field Updated Jan 09, 2013 160
Facility Updated Jan 09, 2013 160
Project Description Updated Jan 09, 2013 160
Activity Added Jan 09, 2013 160
Field Updated Jul 13, 2012 340
Project Description Updated Jul 13, 2012 340
Facility Added Jul 13, 2012 340
Facility Status Added Jul 13, 2012 340
Facility Updated Jul 13, 2012 340
Activity Added Jul 13, 2012 340
Field Updated Aug 09, 2010 1044
Activity Added Aug 09, 2010 1044
Field Updated Aug 06, 2010 1047
Project Description Added Aug 06, 2010 1047
Field Added Jan 08, 2009 1622
Field Status Added Jan 08, 2009 1622
Activity Added Jan 02, 2009 1628

    Project Update History Search - View all the lastest updates made by the SubseaIQ team.
 
 
 
 
Facility Name Pickerill Platform
Duty Gas
Operator Perenco
Current Status Producing since 1992
Host Type Fixed Platform
Water Depth 21 m / 69 ft
Dev.Cost n/a
 
Region UK
 
Location 48/11a, P.037
 
Field Name Juliet
Discovery Date Dec 2008
Block 47/14b, P1745, P1907
Reserve Type Gas
Current Status Discovery (Drilled)
Production Start
Water Depth 62 m / 205 ft