Offshore Field Development Projects
Terang
Operator:Kangean
Water Depth:300 m / 990 ft
Region:Asia - SouthEast
Country:Indonesia
Last Updated:Jun 6, 2012    (view update history)
Project Description
The Terang gas field is situated offshore, East Java, Indonesia in the Kangean PSC area in a water depth of about 295 feet (90 meters). Terang is operated by Kangean Energy, consisting of Indonesia’s Energi Mega Persada (50%), Mitsubishi Corporation (24%) and Japex (25%).

The TSB gas complex is composed of the Terang, Sirasun and Batur gas fields. Development of the field consisted of drilling five production wells and installing a subsea production system.

Gas is sent to the Terang FPU via the East Java gas pipeline, and then sold to the state-owned power company as well as fertilizer factories in the outlying area of Surabaya, East Java.

Terang is expected to produce about 300 MMcf/d.

Further Development

The operator ...
The Terang gas field is situated offshore, East Java, Indonesia in the Kangean PSC area in a water depth of about 295 feet (90 meters). Terang is operated by Kangean Energy, consisting of Indonesia’s Energi Mega Persada (50%), Mitsubishi Corporation (24%) and Japex (25%).

The TSB gas complex is composed of the Terang, Sirasun and Batur gas fields. Development of the field consisted of drilling five production wells and installing a subsea production system.

Gas is sent to the Terang FPU via the East Java gas pipeline, and then sold to the state-owned power company as well as fertilizer factories in the outlying area of Surabaya, East Java.

Terang is expected to produce about 300 MMcf/d.

Further Development

The operator will now start development construction on the Sirasun and Batur fields as well as begin development of the West Kangean field.
Activities
Status Updates
Production Starts in Terang Gas Field
Type: Operator Update

May. 2012 - Kangean Energy Indonesia Ltd. announced that commercial production from the Terang gas field began on May 26, 2012. Terang gas field is located offshore, approximately 56 miles (90 kilometers) north of Bali Island in water approximately 214 feet (90 meters) deep and is part of the TSB gas field complex, which is composed of Terang, Sirasun and Batur gas fields. The produced gas will be first gathered in FPU, supplied through the East Java Gas pipeline and then sold.

BW Joko Tole FPSO
Producing - May 26, 2012 to -

Under Construction - Jul 16, 2010 to May 25, 2012

TSB FPU
Producing - 1994 to -

Terang
Producing - May 26, 2012 to -

Began commercial production

Producing - Under Dev. - 2009 to May 25, 2012

Producing - 1994 to Dec 2008

Gas has been producing from the field since 1994.

Appraisal Drilling - Mar 1990 to Jun 1990

Discovery (Drilled) - Feb 1980 to Mar 1990

Update History
The SubseaIQ Team works everyday to provide you with the latest information on the offshore field development market. The following table provides you with a detailed record of each addition and update made to this project by the SubseaIQ team.
UPDATE TYPE DATE DAYS AGO
Facility Status Updated Jun 06, 2012 871
Facility Status Added Jun 06, 2012 871
Facility Updated Jun 06, 2012 871
Project Description Added Jun 06, 2012 871
Field Updated May 29, 2012 879
Field Status Added May 29, 2012 879
Field Status Updated May 29, 2012 879
Activity Added May 26, 2012 882
Field Added Jul 26, 2010 1552
Field Status Added Jul 26, 2010 1552
Field Updated Jul 26, 2010 1552
Field Status Updated Jul 26, 2010 1552
Facility Added Jul 26, 2010 1552
Facility Status Added Jul 26, 2010 1552
Facility Updated Jul 26, 2010 1552

    Project Update History Search - View all the lastest updates made by the SubseaIQ team.
 
Project Image
Previous Image Next Image
 
 
 
Facility Name BW Joko Tole FPSO
Duty Gas
Operator Kangean
Current Status Producing since 2012
Host Type FPSO
Water Depth 300 m / 990 ft
Dev.Cost n/a
 
Region Indonesia
 
Location
Facility Name TSB FPU
Duty Gas
Operator Kangean
Current Status Producing since 1994
Host Type FPU/FPS
Water Depth 100 m / 330 ft
Dev.Cost n/a
 
Region Indonesia
 
Location Kangean Block
 
Field Name Terang
Discovery Date Feb 1980
Block Kangean Block
Reserve Type Gas
Current Status Producing
Production Start May 2012
Water Depth 100 m / 330 ft