Project Description
The Sapinhoa (Guara) oil discovery, located in the Santos basin pre-salt offshore Brazil in Block BM-S-9, is estimated to contain recoverable volumes of 1 to 2 Bboe. Petrobras, operator, holds 45% interest; BG Group holds 30%; and Repsol holds the remaining 25%.

Discovered in 2008, Guara was drilled by the Stena DrillMAX drillship to a total depth of 20,134 feet (6,137 meters). Situated in a water depth of 7,024 feet (2,141 meters), Guara's discovery well, 1-SPS-55, flowed at a rate of 7,200 boepd. Well tests revealed a very high well productivity index, confirming the well will be used in the EWT.

Field Development

The consortium performed an EWT on the field in 2010, then submitted the Declaration of Commerciality on Dec. 30, 2011. ...
The Sapinhoa (Guara) oil discovery, located in the Santos basin pre-salt offshore Brazil in Block BM-S-9, is estimated to contain recoverable volumes of 1 to 2 Bboe. Petrobras, operator, holds 45% interest; BG Group holds 30%; and Repsol holds the remaining 25%.

Discovered in 2008, Guara was drilled by the Stena DrillMAX drillship to a total depth of 20,134 feet (6,137 meters). Situated in a water depth of 7,024 feet (2,141 meters), Guara's discovery well, 1-SPS-55, flowed at a rate of 7,200 boepd. Well tests revealed a very high well productivity index, confirming the well will be used in the EWT.

Field Development

The consortium performed an EWT on the field in 2010, then submitted the Declaration of Commerciality on Dec. 30, 2011. The consortium will commence the first phase of definitive development in 2013, which should last until 2016. To start the pilot production test on the field, Petrobras awarded several contracts for use on Guara.

In January 2010, Petrobras and partners signed a letter of intent with the Schahin/Modec consortium to charter and operate an FPSO on the Guara field for a 20-year term. The FPSO will be designed to process 120,000 bopd and 5 MMcm/d.

The Guara pilot FPSO will be capable of receiving up to 10 producers and 10 injectors, including spare wells, and the first wells will be vertical to enable better reservoir management.

Aker Solutions received a contract from Petrobras to supply 14 trees for the field. The complete scope of work will be managed, engineered and executed by Aker Solutions' manufacturing facility in Curitiba, Brazil, with support from Aberdeen, UK, for the subsea control systems.


Activities
Status Updates
Petrobras Continues to Increase Production at Sapinhoa
Type: Development Activity

Apr. 2014 - Petrobras announced the start of oil production from the third well at the Sapinhoa field in block BM-S-9 in the Santos Basin offshore Brazil. Well 7-SPH-04-SPS was connected to the Cidade de Sao Paulo FPSO using buoyancy supported risers (BSR) technology. The well is thought to be capable of producing 26,000 bopd. Production is expected to reach the maximum capacity of 120,000 bopd onboard the FPSO when the fourth Sapinhoa well is brought online early in the second half of the year.

Subsea 7 Bags Brazilian Contracts
Type: Contract Award

Mar. 2013 - Subsea 7 was recently awarded two lump sum contracts and one dayrate contract by Brazilian oil giant Petrobras. Combined values of the contracts exceed $300 million. Work scope of the lump sum contracts comprises the installation of two export flexible Lazy Wave risers at the Sapinhoa and Lule NE fields in water depths of almost 7,000 feet. The dayrate contract encompasses project management, engineering and installation of Petrobras-supplied flowlines and umbilicals in both fields.

JV Partners Reach First Oil From Sapinhoa
Type: Production Start

Jan. 2013 - The partners of Block BM-S-9 announced the on schedule start of production at the Sapinhoa field, one of the largest in the Santos Basin. Well 1-SP-55 is the first to be connected to FPSO Cidade de Sao Paulo and will flow at a restricted rate of 15,000 bopd while gas processing and reinjection equipment is commissioned. Upon completion of commissioning, the well will be flowed at a production rate of 25,000 bopd. Ten additional wells will be utilized by the FPSO consisting of five production wells along side five injection wells. Peak field production is expected to occur in the second half of 2014 with the addition of a second FPSO, Cidade de Ilhabela. Both vessels will provide a combined production capability of 270,000 bopd and 388 Mmcf/d of gas.

SBM Offshore Secures Financing to Build Cidade de Ilhabela FPSO
Type: Facility Construction

Aug. 2012 - SBM Offshore and its JV partners QGOG Constellation and Mitsubishi Corporation have secured a US $1.05 billion to finance the construction of the Cidade de Ilhabela FPSO. The loan will be repaid over a 10-year period starting at first oil, which is expected in September 2014 and benefit from a competitive pricing package arranged on a club deal basis with reputable international commercial banks. The vessel will be moored on the Sapinhoa field in 7,024 feet (2,141 meters) of water.

Fluke Engenharia to Fabricate 27 Suction Piles
Type: Subsea Equipment

Jul. 2012 - Fluke Engenharia has received a contract from Subsea 7 to fabricate 27 suction piles for use in the Guara-Lula field, which is part of the pre-salt cluster in the Santos basin offshore Brazil. Fluke Engenharia will manufacture the products at its Macae facilities and will deliver them over the course of 2012.

BG Group Signs Contracts for Topside Modules for Lula, Sapinhoa FPSOs
Type: Facility Construction

Jul. 2012 - BG Group and partners have approved the signature of contracts totaling $4.5 billion for the construction of the first six topside modules and integration packages for eight domestic floating production, storage and offloading units to be used on the Lula (Tupi) and Sapinhoa (Guara) pre-salt projects offshore Brazil.

Petrobras Finds Light Oil in Southern Portion of Sapinhoa
Type: Drilling Operations

Jun. 2012 - Petrobras has found light crude oil at well, 1-BRSA-1045-SPS located in the southern portion of Sapinhoa field at a water depth of 7,222 feet (2,202 meters). The company's cable tests confirmed that the discovery is of around 27 degree API. Under a 'Rights Transfer Agreement', the company is entitled to produce 319 million barrels of crude equivalent in the area. Petrobras is currently trying to drill the well to a depth of 16,590 feet (5,058 meters) to determine the lower limit of the reservoir. After drilling is completed, the company plans to conduct a formation test to determine the productivity of the oil reservoir.

Wartsila Hamworthy to Deliver Inert Gas Generator Units for Tupi, Guara FPSOs
Type: Contract Award

May. 2012 - Wartsila Hamworthy will deliver inert gas generator units to eight FPSOs in the Santos Basin. Six of the units will be deployed for the Tupi fields with the other two being utilized for the Guara field. The first two units will undergo full scale testing at the factory in Moss prior to delivery, starting as soon as the end of December this year and up to the end of January 2015. Each of the units will be installed on the utility module on the FPSO inside a dedicated compartment. The eight FPSOs are currently under construction in Brazil.

Oceaneering to Supply Umbilicals for Lula, Sapinhoa Development
Type: Subsea Equipment

May. 2012 - Petrobras awarded Oceaneering a contract to supply nearly 125 miles (200 kilometers) of thermoplastic production control umbilicals for field development projects, Lula and Sapinhoa, offshore Brazil. Product manufacturing is expected to commence in 3Q 2012 and be completed in 3Q 2015.

Blue Water Grabs Sapinhoa FPSO Conversion Project
Type: Facility Construction

Apr. 2012 - Blue Water Shipping received a contract to provide logistics for materials and equipment to China and Brazil, where the conversion of the Cidade de Ilhabela FPSO is taking place. The FPSO is being converted from a tank vessel which is 1,312 feet (400 meters) long and 230 feet (70 meters) wide. After the conversion, the vessel will be the world's largest FPSO. It will operate at the Sapinhoa field, formerly called Guara, offshore Brazil. The first part of the project takes place in China where the preliminary, basic changes of the tank vessel will be carried out. Subsequently the vessel will sail to SBM's shipyard in Brazil where the final part of the conversion will take place. The entire conversion project is expected to be completed in 2014.

SBM Offshore Signs Lease for Cidade de Ilhabela FPSO
Type: Facility Construction

Apr. 2012 - SBM Offshore has executed a contract for the 20-year charter and operation of FPSO Cidade de Ilhabela for the northern part of the Sapinhoa field, former Guara development, in the pre-salt area, offshore Brazil. The unit will be owned and operated by a Joint Venture comprising of affiliated companies of SBM Offshore and QGOG, and Mitsubishi Corporation. The FPSO will include topside facilities to process 150,000 bpd of production fluids, associated gas treatment for 6,000,000 MMcm/d with compression and carbon dioxide removal, hydrogen sulphide removal, and a water injection facility for 180,000 bpd. First production from the FPSO is planned for the second half of 2014.

Technip to Provide Pipelines for Guara, Lula Development
Type: Subsea Equipment

Feb. 2012 - Petrobras awarded Technip a lump sum contract for the Guara and Lula Nordeste pre-salt field development in the Santos Basin offshore Brazil. The contract covers the manufacture of 15 miles (24 kilometers) of 6-inch-diameter gas injection flexible lines; top risers; intermediate and bottom risers; and flowlines. The gas injection lines will be used to re-inject produced gas into the reservoir to respect new Brazilian environmental regulation. The pipelines will be manufactured at Technip's flexible pipe plants and delivered in two batches, the first one in 2012 and the second in the first quarter of 2013.

Petrobras Submits DOC for Guara Development
Type: Status Update

Jan. 2012 - Petrobras has submitted a Declaration of Commerciality with the Brazilian National Agency of Petroluem, Natural Gas and Biofuels for the accumulation of light oil and gas in the Guara area. This declaration marks the start of the production phase for the field. The consortium will rename the field as Sapinhoa. The consortium drilled four wells in the area, including one well designed for reservoir data acquisition. Drill stem tests were performed on three of the wells. In addition, a five-month extended well test was carried out on the discovery well, confirming the excellent productivity of the Guara reservoir. Data gathered from this test will assist in the optimization of the field development plan. Guara is located in Block BM-S-6 about 186 miles (300 kilometers) off the Sao Paulo state coast. Petrobras serves as the operator of the consortium, holding a 45 percent interest; while BG Group holds 30 percent; and Repsol Sinopec Brazil holds 25 percent.

Petrobras Estimates Guara Presalt Area Holds 2.1B BOE
Type: New Discovery

Dec. 2011 - Petrobras estimates that the Guara presalt area holds roughly 2.1 Bbbl of oil equivalent in Brazil's Santos basin. The new field, located in BM-S-9 block, is formed by reservoirs of high-quality oil. Petrobras sent a declaration of viability to Brazil's national oil regulator, ANP, a year ahead of the deadline it was given. The company plans to submit a development plan to the organization in February.

SBM Offshore Grabs LOI for Guara Norte FPSO
Type: Facility Construction

Aug. 2011 - SBM Offshore announced that one of its affiliates and Queiroz Galvao Oleo e Gas S.A. (QGOG), have received two Letters Of Intent -- one from GUARA BV and one from BM-S-9 Consortium -- for a 20-year lease and operation of an FPSO for the Guara Norte development in the pre-salt area, offshore Brazil. The facility will have topside facilities to handle 150,000 bpd production fluids, associated gas treatment for 6 MMcm/d with compression and carbon dioxide removal, hydrogen sulphide removal, and a water injection facility for 180,000 bpd. It is estimated that delivery of the FPSO will occur in 35 months from LOI. The Guara Norte field is located in Block BM-S-9 in the Santos Basin in about 7,546 feet (2,300 meters) of water.

Parker Hannifin will Supply Steel Wire Tether System for Guara, Lula Project
Type: Subsea Equipment

Jun. 2011 - Subsea 7 granted a mooring contract to Parker Hannifin for the Guara and Lula NE development offshore Brazil. Parker will supply the steel wire tether system for the deepwater project. Petrobras contracted Subsea 7 to provide engineering, procurement, installation and pre-commissioning of four decoupled riser systems in this field. Sub-contractor, Parker, will deliver 34 sheathed tethering lines each measuring more than 6,000 feet (1,829 meters) in length. The tethers will keep the submerged buoys securely moored to the seabed of the Guara and Lula NE fields. Guara is located in Block BM-S-6 about 186 miles (300 kilometers) off the Sao Paulo state coast. Petrobras is the operator of the block.

Saipem to Install Gas Export Pipelines for Guara, Lula Development
Type: Subsea Equipment

May. 2011 - Saipem received an EPCI contract from Petrobras for the Guara & Lula-Northeast gas export pipelines offshore Brazil. The contract encompasses the transportation, installation and pre-commissioning of two export sealines, as well as the engineering, procurement and construction of related subsesa equipment. The first sealine (18-inches in diameter and 54-kilometers-long) will connect the Guara FPSO vessel to a subsea gathering manifold in the Lula field. The second line (18-inches in diameter and 22-kilometers-long) will connect the Lula Northeast FPSO to the same manifold in the Lula field. The Lula development, formerly Tupi, is located in the Santos Basin in water depths of between 6,890 and 7,218 feet (2,100 and 2,200 meters).

Petrobras Confirms High Productivity in Guara
Type: Operator Update

Apr. 2011 - Petrobras announced a formation test in the first Guara area extension well, 3-SPS-69, flowed 6,000 barrels per day of oil. The initial production potential is approximately 50,000 bopd from the presalt formation. Petrobras is now drilling a second extension well, Guara Sul (3-SPS-82A), about 4 miles (7 kilometers) south of the Guara discovery well. Guara is located in Block BM-S-6 about 186 miles (300 kilometers) off the Sao Paulo state coast. Petrobras is the operator of the block.

Subsea 7 Lands $1B Gig for Guara, Lula Development
Type: Development Activity

Apr. 2011 - Petrobras has awarded Subsea 7 a US $1 billion contract for pre-salt development of the deepwater Guara and Lula NE areas. The engineering, procurement, installation and pre-commissioning of four decoupled riser systems includes four 2,094 tons (1,900 tonnes) submerged buoys at 820 feet (250 meters) below the sea level buoy foundations and 27 steel catenary risers associated pipeline end terminations. Engineering work has commenced, and offshore installation is scheduled for the second half of 2012. The oil fields are located in the Santos Basin, offshore Brazil, in a water depth of about 7,218 feet (2,200 meters).

Keppel Receives Two FPSO Engineering Contracts
Type: Contract Award

Feb. 2011 - Keppel FELS Brasil was awarded two FPSO engineering contracts valued at US $300 million. One contract is from Single Buoy Moorings Inc. and the other is from the joint venture company MODEC and Toyo Offshore Production Systems. The contract with SBM is for the fabrication and installation of topside modules on the Cidade De Paraty FPSO, which is currently undergoing conversions at Keppel Shipyard in Singapore. The scope of work includes the fabrication and installation of six process modules and a riser gantry, as well as the installation and integration of another six process modules supplied by SBM. The FPSO will be deployed to the Tupi Nordeste development in the pre-salt region of the Santos Basin. It will have a production capacity of 120,000 bopd, and the ability to compress 5 MMcm/d (177 MMcf/d) of natural gas. Work is expected to commence at Keppel in the first quarter of 2011, with the vessel scheduled to arrive in the first quarter of 2012 with delivery in the fourth quarter of 2012. In its contract with MTOPS, BrasFELS will fabricate and integrate topsides modules for the Cidade de Sao Paulo MV23 FPSO, including riser manifolds, laydown areas and the flare tower, as well as the assembly and integration of fabricated pancakes/skids. Work is scheduled for completion in 4Q 2012, and the FPSO will be deployed on the Guara field in the pre-salt region of the Santos Basin. The vessel will have a production capacity of 120,000 bopd and will have the ability to compress 180 MMcf/d (5 MMcm/d) of natural gas and store 1.6 million barrels of oil.

Petrobras, Partners Charter FPSOs Offshore Brazil
Type: Facility Construction

Jan. 2011 - Petrobras and partners have entered a tender process for the charter of two additional Floating Production, Storage and Offloading vessels for use in the full field development of the discoveries on Blocks BM-S-9 and BM-S-11 in the Santos Basin, offshore Brazil. Each vessel will have a production capacity of 150,000 bopd and about 212 MMcf/d. The modules are being tendered for start-up in 2014. One FPSO is allocated for the Guara Norte area on Block BM-S-9 and the other is for the southern area of the Cernambi field (formerly named Iracema) on Block BM-S-11. To date, with the addition of these two new modules, a total of 13 FPSOs will be designated for the two blocks, including the Carioca and Guara areas on Blocks BM-S-9 and BM-S-11, the Lula (formerly known as Tupi) and Cernambi fields, as well as the Iara area. The first permanent vessel is already in operation on the Lula field, and two additional vessels are due onstream on the Lula field and the Guara area in 2013. Additionally, contracts for eight 150,000 bopd FPSO hulls were awarded in November 2010, with start-up expected between 2015 and 2017.

Petrobras Performs EWT in Guara Area
Type: Status Update

Dec. 2010 - Petrobras has started an Extended Well Test (EWT) at the Guara pre-salt field in the Santos Basin. The EWT is producing through well SPS-55 using the FDSPO Dynamic Producer platform. The test is designed to produce 14,000 bopd, and should last for about five months. Following the completion of the test, Guara will start a pilot production in 2013 at a rate of 120,000 bopd and 5 MMcm/d of natural gas, stated Petrobras. The wells will connect to the Cidade de Sao Paulo FPSO. Guara is estimated to hold between 1.1 and 2 billion boe of high quality oil, with an API gravity of around 30 degrees. Guara is located in Block BM-S-6 about 186 miles (300 kilometers) off the Sao Paulo state coast. Petrobras is the operator of the block.

Petrobras, Partners Sign $3.4B FPSO Deal for Pre-Salt Area
Type: Contract Award

Nov. 2010 - Petrobras and its partners have signed two contracts with the Brazilian outfit Engevix Engenharia S.A. for the construction of eight hulls for platforms to be used in the first phase of production development for the pre-salt area in the Santos Basin, offshore Brazil. The total value of the eight hull EPC contracts is about US $3.46 billion. Once completed, the FPSOs will have the capacity to process up to 150,000 bopd and 212 MMcf/d of natural gas (6 MMcm/d). The hulls will be constructed at the Rio Grande Naval Pole starting in March 2011. The first two hulls will be delivered in 2013, while the others are planned for 2014 and 2015, with production commencing by 2017. Six of the eight FPSOs are allocated for Block BM-S-11, in which the Tupi, Iracema and Iara fields are situated; and the other two vessels are designated for Block BM-S-9, where the Guara and Carioca fields are located. The vessels are in addition to the first permanent FPSO already in use on the Tupi field. Petrobras operates Block BM-S-11, holding a 65% interest. Partners in the consortium include BG (25%), and Galp (10%). Block BM-S-9 is also operated by Petrobras, owning a 45% interest; BG owns 30%; and Repsol owns 25%.

BG Group Boosts Reserves to 2.7Bboe in Santos Basin
Type: Status Update

Nov. 2010 - BG Group has upgraded gross resources for the Tupi, Iracema and Guara fields by 2.7 billion barrels of oil equivalent, bringing the total to 10.8 billion boe, representing a 34% increase. The company's analysis is based on the development of new and sophisticated reservoir models that incorporated new information, including 790,737 acres (3,200 square kilometers) of 3D seismic data; results from nine completed wells (including the 2 original discovery wells on Tupi and Guara); 10 drill stem tests; and the detailed insights gained from the extended well test on Tupi, which has produced 7.6 MMboe to date. BG Group engaged consultants Miller and Lents (MLL) to provide independent verification of the estimates of the fields and have certified the gross resources to be 10.8 billion boe. All three fields are progressing with development, including the first permanent FPSO is now on the Tupi field and commenced production in October 2010; two additional FPSO's were ordered, and will be deployed on the Tupi and Guara fields; negotiations are progressing on the deployment of additional production modules for Tupi, Iracema and Guara; and the gas export pipeline to Mexilhao was completed. The fields are located in the Santos Basin offshore Brazil.

MODEC Enters LOI to Supply FPSO for Guara Field
Type: Facility Construction

Aug. 2010 - MODEC announced that Petrobras, through its subsidiary PNBV, has signed a letter of intent for the supply, charter and operations of an FPSO for the BM-S-9 Block. MODEC will convert the VLCC Radiant Jewel into the FPSO Cidade de Sao Paulo MV23. The FPSO will have the capacity to process 120,000 barrels of oil or 150,000 barrels of total fluids per day. The FPSO, which will be installed on the Guara field, is scheduled for delivery during the fourth quarter of 2012. The Guara oil discovery, located in the Santos basin offshore Brazil in Block BM-S-9, is estimated to contain recoverable volumes of 1 to 2 Bboe. Petrobras, operator, holds 45% interest; BG Group holds 30%; and Repsol holds the remaining 25%.

Guara Planned for Start-Up in 2013
Type: Status Update

Apr. 2010 - The Guara South discovery is expected to commence production in 2013 and the Guara North to start in 2016, according to Dow Jones. Repsol, a partner on the field, sees a plateau output at Guara of about 250,000 barrels of oil equivalent in 2016. A final investment decision of the field is expected at the end of this year. The Guara oil discovery is located in the Santos basin pre-salt offshore Brazil in Block BM-S-9. Petrobras, operator, holds 45% interest; BG Group holds 30%; and Repsol holds the remaining 25%.

Aker Will Supply Subsea Trees for Iara, Guara Developments
Type: Contract Award

Apr. 2010 - Aker Solutions received a US $300 million contract from Petrobras to supply 40 subsea trees for the Iara and Guara fields, located in the pre-salt area of the Santos Basin offshore Brazil. The scope of work includes engineering and manufacturing 40 vertical subsea trees in a water depth of 8,202 feet (2,500 meters), subsea control systems and 17 complete tool sets. Delivery of the first subsea tree is scheduled for the end of 2011, and the remaining trees will be delivered over the next four years. Fourteen trees will be allocated for the Guara field (BM-S-9), and 26 trees will be for the Iara field (BM-S-11). The complete scope of work will be managed, engineered and executed by Aker Solutions' manufacturing facility in Curitiba, Brazil, with support from Aberdeen, UK, for the subsea control systems. Petrobras serves as the operator of both fields.

Petrobras Signs LOI for Guara FPSO, Offshore Brazil
Type: Contract Award

Jan. 2010 - Petrobras and partners signed a letter of intent with the Schahin/Modec consortium to charter and operate an FPSO on the Guara field for a 20-year term. While 65% local content is required in the construction of the new unit and several modules will be integrated in Brazil, the hull will be converted abroad. Expected to go online in late 2012, Guara's FPSO will have the capacity to produce 120,000 bopd and 5 MMcf/d. Guara is located in the Santos basin (pre-salt section) offshore Brazil in Block BM-S-9, and is estimated to contain recoverable volumes of 1 to 2 Bboe. Petrobras, operator, holds 45% interest; BG Group holds 30%; and Repsol holds the remaining 25%.

BG Declares 40 T's May Be Recovered from Three Brazilian Oil Fields
Type: Status Update

Nov. 2009 - As much as 40 Tcf of natural gas is expected to be redeemed from the Tupi, Iara and Guara oil fields offshore Brazil, according to estimates from BG Group. The three discoveries are touted to be some of the largest oil finds in the world, and are estimated to hold between 9.1 billion and 14 billion barrels of oil equivalent. Currently, the operator is analyzing how to best monetize the reserves with one option being to convert gas reserves into LNG.

Santos Basin's Guara Contains 1.1-2B Recoverable Barrels
Type: New Discovery

Sep. 2009 - Petrobras (45%) and partners BG Group (30%) and Repsol (25%) have announced that the Guara discovery in the Santos Basin pre-salt, offshore Brazil in Block BM-S-9, has been completed and has proved the very high productivity of the oil-bearing reservoirs in the pre-salt layer in this area. Guara is now estimated to contain recoverable volumes of 1.1 to 2.0 billion barrels of oil equivalent, with oil gravity of 30 degrees API. During its drill stem test, Guara flowed at 7,000 barrels of oil equivalent per day (boepd). These flow rates were facilities-constrained, and test data indicates that a permanent production well would be capable of producing initial rates of up to 50,000 boepd, providing further evidence of the robust economics of this pre-salt play. The tested well, 1-SPS-55 (1-BRSA-594), informally known as Guara, is located in an assessment area in block BM-S-9, at a depth of 7,024 feet (2,141 meters) from the waterline, some 193 miles (310 kilometers) off the coast of the State of Sao Paulo and 34 miles (55 kilometers) southeast of well 1-RJS-628A (1-BRSA-369A), known as Tupi.

Cidade de Ilhabela FPSO
Under Construction - Apr 02, 2012 to -

The FPSO will include topside facilities to process 150,000 bpd of production fluids, associated gas treatment for 6,000,000 MMcm/d with compression and carbon dioxide removal, hydrogen sulphide removal, and a water injection facility for 180,000 bpd. First production from the FPSO is planned for the second half of 2014.

Cidade de Sao Paulo FPSO
Producing - Jan 03, 2012 to -

Under Construction - Feb 2011 to Jan 02, 2012

Prospect - Aug 23, 2010 to Feb 2011

MODEC signed a letter of intent for the supply, charter and operations of an FPSO for the BM-S-9 Block. MODEC will convert the VLCC Radiant Jewel into the FPSO Cidade de Sao Paulo MV23. The FPSO will have the capacity to process 120,000 barrels of oil or 150,000 barrels of total fluids per day. The FPSO, which will be installed on the Guara field, is scheduled for delivery during the fourth quarter of 2012.

Sapinhoa (Guara)
Producing - Under Dev. - Jan 03, 2012 to -

Under Development - 2010 to Jan 02, 2012

Discovery (Drilled) - Aug 2008 to 2010

During its drill stem test, Guara flowed at 7,000 boepd.

Exploratory Drilling - Mar 2008 to Aug 2008

Stena DrillMax drilled exploration well 1-BRSA-594-SPS

Update History
The SubseaIQ Team works everyday to provide you with the latest information on the offshore field development market. The following table provides you with a detailed record of each addition and update made to this project by the SubseaIQ team.
UPDATE TYPE DATE DAYS AGO
Facility Updated Apr 08, 2014 17
Field Updated Apr 08, 2014 17
Activity Added Apr 08, 2014 17
Field Updated Mar 15, 2013 406
Activity Added Mar 15, 2013 406
Field Updated Jan 09, 2013 471
Facility Updated Jan 09, 2013 471
Activity Added Jan 09, 2013 471
Facility Updated Aug 08, 2012 625
Activity Added Aug 08, 2012 625
Field Updated Jul 25, 2012 639
Activity Added Jul 25, 2012 639
Activity Added Jul 20, 2012 644
Field Updated Jun 11, 2012 683
Activity Added Jun 11, 2012 683
Activity Added May 21, 2012 704
Field Updated May 21, 2012 704
Field Updated May 08, 2012 717
Facility Updated May 08, 2012 717
Activity Added May 08, 2012 717
Facility Updated Apr 18, 2012 737
Activity Added Apr 18, 2012 737
Facility Added Apr 18, 2012 737
Facility Status Added Apr 18, 2012 737
Facility Status Updated Apr 18, 2012 737
Field Updated Apr 18, 2012 737
Activity Added Apr 02, 2012 753
Activity Added Feb 27, 2012 788
Field Status Updated Jan 10, 2012 836
Field Status Added Jan 10, 2012 836
Facility Status Updated Jan 10, 2012 836
Facility Status Added Jan 10, 2012 836
Project Description Updated Jan 10, 2012 836
Field Updated Jan 03, 2012 843
Project Description Updated Jan 03, 2012 843
Activity Added Jan 03, 2012 843
Activity Added Dec 30, 2011 847
Activity Added Aug 11, 2011 988
Field Status Updated Jun 16, 2011 1044
Field Status Added Jun 16, 2011 1044
Activity Added Jun 15, 2011 1045
Activity Added May 05, 2011 1086
Field Updated Apr 12, 2011 1109
Activity Added Apr 12, 2011 1109
Activity Added Apr 07, 2011 1114
Facility Updated Feb 14, 2011 1166
Facility Status Updated Feb 14, 2011 1166
Facility Status Added Feb 14, 2011 1166
Activity Added Feb 14, 2011 1166
Field Updated Jan 07, 2011 1204
Activity Added Jan 07, 2011 1204
Activity Added Dec 28, 2010 1214
Facility Updated Nov 22, 2010 1250
Activity Added Nov 11, 2010 1261
Project Description Updated Nov 02, 2010 1270
Field Updated Nov 02, 2010 1270
Activity Added Nov 02, 2010 1270
Facility Added Nov 02, 2010 1270
Facility Status Added Nov 02, 2010 1270
Facility Status Updated Nov 02, 2010 1270
Activity Added Aug 23, 2010 1341
Project Description Updated May 05, 2010 1451
Activity Added Apr 29, 2010 1457
Field Updated Apr 29, 2010 1457
Field Updated Apr 20, 2010 1466
Activity Added Apr 20, 2010 1466
Activity Added Jan 28, 2010 1548
Activity Added Nov 18, 2009 1619
Project Description Updated Oct 12, 2009 1656
Field Status Updated Sep 16, 2009 1682
Field Status Added Sep 16, 2009 1682
Field Status Updated Sep 10, 2009 1688
Field Status Added Sep 10, 2009 1688
Project Description Added Sep 10, 2009 1688
Field Updated Sep 10, 2009 1688
Activity Added Sep 09, 2009 1689
Field Added Sep 09, 2009 1689
Field Updated Sep 09, 2009 1689

    Project Update History Search - View all the lastest updates made by the SubseaIQ team.
 
Project Map
Project Image
Previous Image Next Image
 
 
 
Facility Name Cidade de Ilhabela FPSO
Duty Oil/Gas
Operator Petrobras (NOC)
Current Status Under Construction since 2012
Host Type FPSO
Water Depth 2,140 m / 7,062 ft
Dev.Cost n/a
 
Region Brazil
 
Location BM-S-9
Facility Name Cidade de Sao Paulo FPSO
Duty Oil/Gas
Operator Petrobras (NOC)
Current Status Producing since 2012
Host Type FPSO
Water Depth 2,141 m / 7,065 ft
Dev.Cost n/a
 
Region Brazil
 
Location BM-S-9
 
Field Name Sapinhoa (Guara)
Discovery Date Aug 2008
Block BM-S-9
Reserve Type Oil/Gas
Current Status Producing - Under Dev.
Production Start
Water Depth 2,141 m / 7,065 ft